Document Details
Name of Department/Committee : CHD 20
Document Number : CHD 20 ( 26400)
Document Title [English] : METHODS OF SAMPLING AND TEST FOR PAINTS VARNISHES AND RELATED PRODUCTS Part 2 test on liquid paints chemical examination Sec 2 Determination of non-volatile-matter content
Document Title [Hindi] : रंग रोगन, वार्निश और संबंधित उत्पादों के लिए नमूने और परीक्षण की पद्धतियाँ भाग 2 तरल रंग रोगन पर परीक्षण ( रसायन परीक्षण ) अनुभाग 2 गैर-वाष्पशील-पदार्थ सामग्री का निर्धारण
Document Type : Revision
Language : English
Priority : 2
ICS Code : 87.040
Date of Project Approval : 07-03-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 101 : Part 2 : Sec 2: 1986
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 101 : Part 2 : Sec 2: 1986


Classification Details
Group : Building Materials including Paints
Sub Group : Pigments, Paints and Accessories
Sub Sub Group : Brushes for painting
Aspects : Methods of tests
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Chemicals and Fertilizers - Department of Chemicals and Petrochemicals (DCPC)
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Modified/Technically Equivalent
Identical/Equivalent Standards : ISO 3251 : 2019
Organization Type: ISO

Sl.No. Synosis Points
1 This standard specifies method for determining the non-volatile-matter content and volatile matter content by mass in paints varnishes and related products. In this fourth revision, the Sectional Committee, recognizing the significance of globally uniform practices, has decided to adopt ISO 3521:2019 as an Indian Standard in dual number. Modifications have been made to align with the specific needs of the Indian paint industry, and these modifications are detailed in National Annex B.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 22-08-2024 22-12-2024 22-01-2025 22-05-2025 Mr. Pushpendra Kumar 22-08-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 07-03-2024 -------
2 P-Draft Waived 22-08-2024 -------
3 WC Draft 22-08-2024 Duration : 65 Days
Submitted for HOD approval
Remarks : The Sectional Committee in its 28th Meeting has decided to send the revised draft into wide circulation for a period of 2 months
-------
4 WC Draft 30-08-2024 WC rejected by HOD
Remarks: Please recheck the Foreword
-------
5 WC Draft 02-09-2024 Duration : 65 Days
Submitted for HOD approval
Remarks : As suggested the suitable corrections have been done
-------
6 WC Draft 03-09-2024 WC rejected by HOD
Remarks: Please review the Foreword.
-------
7 WC Draft 03-09-2024 Duration : 65 Days
Submitted for HOD approval
Remarks : As discussed changes have been done
-------
8 WC Draft 06-09-2024 WC approved by HOD
CHDC   -------