Document Details |
|
Name of Department/Committee : | EED 01 |
---|---|
Document Number : | EED 01 ( 25248) |
Document Title [English] : | CARBON DIOXIDE CAPTURE PART 1: PERFORMANCE EVALUATON METHODS FOR POST-COMBUSTION CO2 CAPTURE INTEGRATED WITH A POWER PLANT |
Document Title [Hindi] : | कार्बन डाइऑक्साइड कैप्चर - भाग 1: एक विद्युत संयंत्र के साथ एकीकृत दहन के बाद CO2 कैप्चर के लिए प्रदर्शन मूल्यांकन विधियाँ |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 13.020.40 |
Date of Project Approval : | 12-04-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Environment management |
Sub Sub Group : | Environmental Management |
Aspects : | Code of Practice |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | PERFORMANCE EVALUATON METHODS FOR POST-COMBUSTION CO2 CAPTURE INTEGRATED WITH A POWER PLANT |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 27919 PART 1: 2018 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This standard specifies method for measuring, evaluating and reporting the performance of post-combustion CO2 capture (PCC) integrated with a power plant, and which separates CO2 from the power plant flue gas in preparation for subsequent transportation and geological storage, In particular, it provides a common methodology to calculate specific key performance indicators for the PCC plant, requiring the definition of the boundaries of a typical system and the measurements needed to determine the KPIs. | |
2 | This standard coves thermal power plants burning carbonaceous fuels, such as coal, oil natural gas and biomass derived fuels, which are producing CO2¬ from boilers or gas turbines and are integrated with CO2 capture. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 12-04-2024 | ------- | ||
2 | P-Draft Waived | 15-04-2024 | The Draft National Forward is approved for the wide circulation in the 31st meeting of CHD 34 | ------- | |
3 | WC Draft | 18-04-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 19-04-2024 | WC approved by HOD |
EEDC CHD 34, CHD 34 : 3, | ------- |