Document Details
Name of Department/Committee : EED 01
Document Number : EED 01 ( 25245)
Document Title [English] : CARBON DIOXIDE CAPTURE TRANSPORTATION AND GEOLOGICAL STORAGE - CARBON DIOXIDE STORAGE USING ENHANCED OIL RECOVERY (CO2 - EOR)
Document Title [Hindi] : कार्बन डाइऑक्साइड कैप्चर, परिवहन और भूवैज्ञानिक भंडारण - उन्नत तेल पुनर्प्राप्ति (सीओ2 - ईओआर) का उपयोग करके कार्बन डाइऑक्साइड भंडारण
Document Type : New
Language : English
Priority : 3
ICS Code : 13.020.40
Date of Project Approval : 12-04-2024
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Environment management
Sub Sub Group : Environmental Management
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title : CARBON DIOXIDE STORAGE USING ENHANCED OIL RECOVERY (CO2 - EOR)
ITCHS Code :
Ministry :
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
  • CLIMATE ACTION
  • LIFE ON LAND
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 27916:2019
Organization Type: ISO

Sl.No. Synosis Points
1 This standard applies to carbon dioxide (CO2) that is injected in enhanced recovery operations for oil and other hydrocarbons (CO2-EOR) for which quantification of CO2 that is safely stored long-term in association with the CO2-EOR project is sought.
2 The conceptual boundary of this document for CO2 stored in association with CO2-EOR includes: a) safe, long-term containment of CO2 within the EOR complex; b) CO2 leakage from the EOR complex through leakage pathways; and c) on-site CO2-EOR project loss of CO2 from wells, equipment or other facilities.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 12-04-2024 12-08-2024 12-09-2024 12-01-2025 Mr. MOHIT GARG 12-04-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 12-04-2024 -------
2 P-Draft Waived 15-04-2024 The Draft National Forward is approved for the wide circulation in the 31st meeting of CHD 34 -------
3 WC Draft 18-04-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 19-04-2024 WC approved by HOD
EEDC  CHD 34, CHD 34 : 3, -------