Document Details |
|||||
Name of Department/Committee : | WRD 10 | ||||
---|---|---|---|---|---|
Document Number : | WRD 10 ( 25190) | ||||
Document Title [English] : | DETERMINATION OF EFFECTS OF SEDIMENTATION IN PLANNING AND PERFORMANCE OF RESERVOIRS GUIDELINES First Revision of IS 12182 | ||||
Document Title [Hindi] : | जलाशयों की योजना और निष्पादन में अवसादन के प्रभावों का निर्धारण — दिशानिर्देश | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.160 | ||||
Date of Project Approval : | 08-04-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Reservoirs-Planning, Design, Construction, Operation and maintenance |
Aspects : | Others |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This revision has been brought out to bring the standard in the latest style and format of the Indian Standards. In addition, the following major changes have been incorporated: a) The definition of full-service time is modified in accordance with IS 4410 Part 6: 2022. b) Modification in Cl 5.1 (b) for studying the effects of sedimentation. c) Modification in cl 5.2.2.4 in accordance with IS 6518: 2017. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 08-04-2024 | ------- | ||
2 | P-Draft Waived | 02-05-2024 | ------- | ||
3 | WC Draft | 02-05-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 02-05-2024 | WC approved by HOD |
WRDC | ------- |