Document Details
Name of Department/Committee : ETD 08
Document Number : ETD 08 ( 25995)
Document Title [English] : High-voltage switchgear and controlgear Part 202: AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV First Revision
Document Title [Hindi] : High-voltage switchgear and controlgear – Part 202: AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV (First Revision)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 29.130.10
Date of Project Approval : 26-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 62271 : Part 202: 2014
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 62271 : Part 202: 2014


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Switchgear, Metering and Accessories
Sub Sub Group : Circuit breakers, switches and disconnectors
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
  • Ministry of Heavy Industries
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 62271-202:2022
Organization Type: IEC

Sl.No. Synosis Points
1 The document specifies the service conditions, rated characteristics, general structural requirements and test methods of enclosed high-voltage prefabricated substations. These prefabricated substations are cable-connected to AC high-voltage networks with an operating voltage up to and including 52 kV and power frequencies up to and including 60 Hz. They can be manually operated from inside (walk-in type) or from outside (non-walk-in type). They are designed for outdoor installation at locations with public accessibility and where protection of personnel is provided.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 26-06-2024 26-11-2024 10-02-2025 25-06-2025 Mr. Ashok Kumar 26-06-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 26-06-2024 -------
2 P-Draft 26-06-2024 Covering letter generated -------
3 P-Draft 26-06-2024 Duration : 30 Days ETD 8, -------
4 Skipped to W-Draft 09-08-2024 Stage-Changed -------
5 WC Draft 27-08-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The document was circulated as a P-draft on 26-06-2024 No comments were received on the P-draft During the last meeting the committee decided to wide circulate the draft for 60 days in case no comments are received on the P-draft
-------
6 WC Draft 03-09-2024 WC approved by HOD
ETDC   -------