Name of Department/Committee : ETD 08
Document Number : ETD 08 ( 25993)
Document Title [English] : High-voltage switchgear and controlgear Part 207: Seismic qualification for gas-insulated switchgear assemblies metal enclosed and solid-insulation enclosed switchgear for rated voltages above 1 kV Second Revision
Document Title [Hindi] : High-voltage switchgear and controlgear – Part 207: Seismic qualification for gas-insulated switchgear assemblies, metal enclosed and solid-insulation enclosed switchgear for rated voltages above 1 kV (Second Revision)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 29.130.10
Date of Project Approval : 26-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 62271 : PART 207: 2012
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 62271 : PART 207: 2012


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Switchgear, Metering and Accessories
Sub Sub Group : Circuit breakers, switches and disconnectors
Aspects : Code of Practice
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
  • Ministry of Heavy Industries
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 62271-207: 2023
Organization Type: IEC

Sl.No. Synosis Points
1 This document applies to – gas-insulated switchgear (GIS) assemblies • for alternating current of rated voltages above 52 kV complying with IS/IEC 62271-203, and • for direct current of rated voltages including and above 100 kV, • for indoor and outdoor installations, including their supporting structures.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 26-06-2024 26-11-2024 10-02-2025 25-06-2025 Mr. Ashok Kumar 26-06-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 26-06-2024 -------
2 P-Draft 26-06-2024 Covering letter generated -------
3 P-Draft 26-06-2024 Duration : 30 Days ETD 8, -------
4 Skipped to W-Draft 09-08-2024 Stage-Changed -------
5 WC Draft 27-08-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The document was circulated as a P-draft on 26-06-2024 No comments were received on the P-draft During the last meeting the committee decided to wide circulate the draft for 60 days in case no comments are received on the P-draft
-------
6 WC Draft 03-09-2024 WC approved by HOD