Document Details
Name of Department/Committee : WRD 12
Document Number : WRD 12 ( 25932)
Document Title [English] : DESIGN AND USE OF RUBBER SEALS FOR HYDRAULIC GATES - RECOMMENDATIONS
Document Title [Hindi] : द्रवचालित गेट के लिये विभिन्‍न प्रकार की रबड की सीलों के डिजाइन एवं उपयोग - दिशानिर्देश
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 93.160
Date of Project Approval : 03-04-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11855: 2017
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Geological Maps, subsurface Exploratory Logs and Geological Explorations for river valley projects
Aspects : Code of Practice
Risk : Low
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti - Department of Water Resources, River Development and Ganga Rejuvenation
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard was first published in 1986 and was revised in 2004. In the second revision, IS 11855 : 2004 ‘Guidelines for design and use of different types of rubber seals for hydraulic gates’ and IS 15466 : 2004 ‘Rubber seals for hydraulic gates — Specification’ have been amalgamated and additional sketches for assembly details with wedge type of seal have been added for clarity of users. Hence IS 15466 : 2004 ‘Rubber seals for hydraulic gates — Specification’ shall stand withdrawn.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 21-06-2024 21-11-2024 05-02-2025 20-06-2025 Mr. Vaibhav Yadav 21-06-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 03-04-2024 -------
2 P-Draft Waived 21-06-2024 -------
3 WC Draft 21-06-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 26-06-2024 WC rejected by HOD
Remarks: MS to rework upon the WC document and put up
-------