Document Details |
|||||
Name of Department/Committee : | MED 18 | ||||
---|---|---|---|---|---|
Document Number : | MED 18 ( 25931) | ||||
Document Title [English] : | BUILDING CONSTRUCTION MACHINERY AND EQUIPMENT MACHINERY FOR CONCRETE SURFACE FLOATING AND FINISHING PART 1 COMMERCIAL SPECIFICATIONS First Revision Adoption of ISO 13105-1 | ||||
Document Title [Hindi] : | भवन निर्माण मशीनें एवं उपकरण — कंक्रीट धरातल फलोटिंग एवं फिनिशिंग के लिए मशीनरी भाग 1 वाणिज्यिक विशिष्टि ( पहला पुनरीक्षण ) ( ISO 13105-1 का अधिग्रहण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 91.220; 01.040.91 | ||||
Date of Project Approval : | 16-05-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Construction practices, measurement and management |
Sub Sub Group : | Building Construction machinery |
Aspects : | Product Specification |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | ISO 13105-1 : 2023 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This part of ISO 13105 defines terms and commercial specifications for machines used for concrete surface floating and finishing (also known as power trowels). This includes pedestrian-controlled equipment and ride-on equipment. It does not address strike-off type machines, commonly known as screeds. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 16-05-2024 | ------- | ||
2 | P-Draft | 21-06-2024 | Covering letter generated | ------- | |
3 | P-Draft | 21-06-2024 | Duration : 30 Days Remarks : Committee approved for adoption of the revised standard during 28th Meeting of MED 18 |
MED 18, | ------- |
4 | Skipped to W-Draft | 23-01-2025 | Stage-Changed | ------- | |
5 | WC Draft | 23-01-2025 | Duration : 30 Days Submitted for HOD approval Remarks : HMED may kindly approve |
------- | |
6 | WC Draft | 24-01-2025 | WC rejected by HOD Remarks: Wrong upload |
------- | |
7 | WC Draft | 24-01-2025 | Duration : 30 Days Submitted for HOD approval Remarks : HMED may kindly approve |
------- | |
8 | WC Draft | 27-01-2025 | WC approved by HOD |
MEDC MED 18, | ------- |