Document Details |
|||||
Name of Department/Committee : | WRD 12 | ||||
---|---|---|---|---|---|
Document Number : | WRD 12 ( 25926) | ||||
Document Title [English] : | RECOMMENDATIONS FOR STRUCTURAL DESIGN OF RADIAL GATES | ||||
Document Title [Hindi] : | रेडियल गेट्स की संरचनात्मक डिजाइन के लिए अनुशंसाएँ | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 93.160 | ||||
Date of Project Approval : | 03-04-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Geological Maps, subsurface Exploratory Logs and Geological Explorations for river valley projects |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The fourth revision of this standard has been brought out to update the standard in the light of experience gained and the latest trends in design. The major changes incorporated on this revision are: a) Annex B on recommended material for different components has been updated, b) Table 1 to Table 3 have been updated in line with IS 4622, c) Annex C has been updated in line with IS 4622, d) Recommended materials for components of gate have been updated with addition of new materials, e) Fig. 3 of radial gate and its components have been updated, and f) Silt loading has been taken into consideration |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 03-04-2024 | ------- | ||
2 | P-Draft Waived | 21-06-2024 | ------- | ||
3 | WC Draft | 21-06-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 24-06-2024 | WC approved by HOD |
WRDC | ------- |