Document Details
Name of Department/Committee : CED 51
Document Number : CED 51 ( 25908)
Document Title [English] : Modular co-ordination - Terminology Third Revision
Document Title [Hindi] : मॉड्यूलर कोआर्डिनेशन - शब्दावली (तीसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 91.010.30
Date of Project Approval : 24-03-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 4993: 1983
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 4993: 1983


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Physical planning of buildings
Sub Sub Group : Building Drawing, Planning, Byelaws and Housing
Aspects : Terminology
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title : Modular co-ordination
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • SUSTAINABLE CITIES AND COMMUNITIES
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard gives definitions of terms used in modular co-ordination for study, planning and construction of buildings designed in accordance with the principles of modular co-ordination and for the study and manufacture of the components used in such buildings.
2 The definitions of terms related to tolerances in modular coordination are excluded from this standard and are covered in IS 6408 (Part 1).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 19-06-2024 19-11-2024 03-02-2025 18-06-2025 Mr. JITENDRA KUMAR CHAUDHARY 19-06-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 24-03-2023 -------
2 P-Draft Waived 20-06-2024 -------
3 WC Draft 20-06-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : The draft standard was approved for wide circulation in the 12th meeting of CED 51
-------
4 WC Draft 20-06-2024 WC rejected by HOD
Remarks: No page numbers
-------
5 WC Draft 20-06-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : Page numbers has been added The updated draft is attached
-------
6 WC Draft 20-06-2024 WC approved by HOD
CEDC  CED 51, CED 46, -------