Document Details
Name of Department/Committee : CED 51
Document Number : CED 51 ( 25907)
Document Title [English] : Recommendations for modular co-ordination in building industry: Tolerances: Part 1 Glossary of terms Second Revision
Document Title [Hindi] : भवन निर्माण उद्योग में मॉड्यूलर कोआर्डिनेशन के लिए रेकमेन्डेशन: सहनशीलता: भाग 1 शब्दों की शब्दावली ( दूसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 91.010.30
Date of Project Approval : 24-03-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 6408 : Part 1: 1990
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 6408 : Part 1: 1990


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Physical planning of buildings
Sub Sub Group : Building Drawing, Planning, Byelaws and Housing
Aspects : Terminology
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title : Modular co-ordination in building industry: Tolerances: Part 1 Glossary of terms
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • SUSTAINABLE CITIES AND COMMUNITIES
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard (Part 1) defines the terms used in the principles and applications of tolerances used in the study, planning, design and construction of buildings carried out in accordance with the principles of modular co-ordination.
2 This revision is brought out as the Committee responsible for this standard felt the need to cover the terminology in a comprehensive manner and add further definitions on the basis of experience gained over the years and also to bring it in line with the National Building Code of India 2016 (SP 7 : 2016). In this revision, besides the modification of the existing definitions, a number of new terms have also been included with a view to bringing about uniformity in the expression of various terms applicable to modular coordination.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 19-06-2024 19-11-2024 03-02-2025 18-06-2025 Mr. JITENDRA KUMAR CHAUDHARY 19-06-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 24-03-2023 -------
2 P-Draft Waived 20-06-2024 -------
3 WC Draft 20-06-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : The draft standard was approved for wide circulation in the 12th meeting of CED 51
-------
4 WC Draft 20-06-2024 WC approved by HOD
CEDC  CED 51, CED 46, -------