Document Details
Name of Department/Committee : ETD 37
Document Number : ETD 37 ( 25868)
Document Title [English] : ALUMINIUM CONDUCTOR FOR OVERHEAD TRANSMISSION PURPOSES SPECIFICATION PART 2 ALUMINIUM CONDUCTORS GALVANIZED STEEL REINFORCED FOR OVERHEAD TRANSMISSION LINES Fourth Revision
Document Title [Hindi] : ALUMINIUM CONDUCTOR FOR OVERHEAD TRANSMISSION PURPOSES — SPECIFICATION PART 2 ALUMINIUM CONDUCTORS — GALVANIZED STEEL — REINFORCED FOR OVERHEAD TRANSMISSION LINES (Fourth Revision)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 29.060.01, 29.240.20
Date of Project Approval : 18-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 398 : Part 2: 1996
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Cables, Conductors, Wires and Accessories
Sub Sub Group : Aluminum overhead conductors
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard (Part 2) covers the requirements and tests for aluminium conductors, galvanized steel-reinforced (ACSR) used for overhead transmission lines.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 18-06-2024 18-11-2024 02-02-2025 17-06-2025 Mr. Ashok Kumar 18-06-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 18-06-2024 -------
2 P-Draft 18-06-2024 Covering letter generated -------
3 P-Draft 18-06-2024 Duration : 12 Days ETD 37, -------
4 Skipped to W-Draft 05-09-2024 Stage-Changed -------
5 WC Draft 05-09-2024 Duration : 45 Days
Submitted for HOD approval
Remarks : The Working Panel conducted the meeting to discuss the comments received on P-draft on 24-07-2024 The updated draft was circulated among the committee members for one month During the circulation period no comments were received from the committee members It was decided to wide circulate the draft standard for 45 days with the approval of the Chairman ETD 37
-------
6 WC Draft 11-09-2024 WC rejected by HOD
Remarks: Please make corrections as discussed. For some of the requirements, discussion will be required with the members of the SC
-------
7 WC Draft 22-09-2024 Duration : 45 Days
Submitted for HOD approval
Remarks : As discussed the draft document has been updated after discussions with the SC members
-------
8 WC Draft 23-09-2024 WC rejected by HOD
Remarks: Please make correction in the foreword
-------
9 WC Draft 23-09-2024 Duration : 45 Days
Submitted for HOD approval
Remarks : The errors in the foreword section have been corrected
-------
10 WC Draft 24-09-2024 WC approved by HOD
ETDC   -------