Document Details |
|||||
Name of Department/Committee : | ETD 37 | ||||
---|---|---|---|---|---|
Document Number : | ETD 37 ( 25868) | ||||
Document Title [English] : | ALUMINIUM CONDUCTOR FOR OVERHEAD TRANSMISSION PURPOSES SPECIFICATION PART 2 ALUMINIUM CONDUCTORS GALVANIZED STEEL REINFORCED FOR OVERHEAD TRANSMISSION LINES Fourth Revision | ||||
Document Title [Hindi] : | ALUMINIUM CONDUCTOR FOR OVERHEAD TRANSMISSION PURPOSES — SPECIFICATION PART 2 ALUMINIUM CONDUCTORS — GALVANIZED STEEL — REINFORCED FOR OVERHEAD TRANSMISSION LINES (Fourth Revision) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 29.060.01, 29.240.20 | ||||
Date of Project Approval : | 18-06-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Cables, Conductors, Wires and Accessories |
Sub Sub Group : | Aluminum overhead conductors |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard (Part 2) covers the requirements and tests for aluminium conductors, galvanized steel-reinforced (ACSR) used for overhead transmission lines. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 18-06-2024 | ------- | ||
2 | P-Draft | 18-06-2024 | Covering letter generated | ------- | |
3 | P-Draft | 18-06-2024 | Duration : 12 Days | ETD 37, | ------- |
4 | Skipped to W-Draft | 05-09-2024 | Stage-Changed | ------- | |
5 | WC Draft | 05-09-2024 | Duration : 45 Days Submitted for HOD approval Remarks : The Working Panel conducted the meeting to discuss the comments received on P-draft on 24-07-2024 The updated draft was circulated among the committee members for one month During the circulation period no comments were received from the committee members It was decided to wide circulate the draft standard for 45 days with the approval of the Chairman ETD 37 |
------- | |
6 | WC Draft | 11-09-2024 | WC rejected by HOD Remarks: Please make corrections as discussed. For some of the requirements, discussion will be required with the members of the SC |
------- | |
7 | WC Draft | 22-09-2024 | Duration : 45 Days Submitted for HOD approval Remarks : As discussed the draft document has been updated after discussions with the SC members |
------- | |
8 | WC Draft | 23-09-2024 | WC rejected by HOD Remarks: Please make correction in the foreword |
------- | |
9 | WC Draft | 23-09-2024 | Duration : 45 Days Submitted for HOD approval Remarks : The errors in the foreword section have been corrected |
------- | |
10 | WC Draft | 24-09-2024 | WC approved by HOD |