Document Details
Name of Department/Committee : TXD 05
Document Number : TXD 05 ( 25857)
Document Title [English] : Textiles Tests for colour fastness Part B04: Colour fastness to artificial weathering: Xenon arc fading lamp testFirst Revision
Document Title [Hindi] : वस्त्रादि — रंग के पक्केपन का परीक्षण भाग B 04 — जिनेन आर्क फ़ेडिंग लैंप द्वारा कृञिम मौसम के प्रति रंगो का पक्कापन (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 59.080.01
Date of Project Approval : 12-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS/ISO 105-B04: 1994
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/ISO 105-B04: 1994


Classification Details
Group : Textile, Textile Products and Machinery
Sub Group : Cotton, wool and man made textile Products
Sub Sub Group : Cotton and man-made textiles
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Textiles
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : ISO 105-B04:2024
Organization Type: ISO

Sl.No. Synosis Points
1 Test specimens of the textile are exposed under specified conditions to light from a xenon arc lamp and to water spray. At the same time, eight dyed blue wool references are exposed to light but are protected from water spray by a sheet of window glass. The fastness is assessed by comparing the change in colour of the test specimen with that of the references. If the method is used to determine if a textile is sensitive to the combined effect of light and water (see 7.2), the simultaneous exposure of references is unnecessary. In this case, the assessment shall be performed by comparison with the grey scale in accordance with ISO 105-A02 or by colour measurement in accordance with ISO 105-A05.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 14-06-2024 14-11-2024 29-01-2025 13-06-2025 DHARMBEER 14-06-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 12-06-2024 -------
2 P-Draft Waived 14-06-2024 -------
3 WC Draft 23-06-2024 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 24-06-2024 WC approved by HOD
TXDC  TXD 01, TXD 05, TXD 07, -------