Document Details
Name of Department/Committee : MTD 03
Document Number : MTD 03 ( 25818)
Document Title [English] : Metallic materials Rockwell hardness testPart 3: Calibration of reference blocks
Document Title [Hindi] : धात्विक सामग्री - रॉकवेल कठोरता परीक्षण भाग 3: संदर्भ खण्डों का अंशशोधन
Document Type : Revision
Language : English
Priority : 3
ICS Code : 77.040.10
Date of Project Approval : 17-05-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 1586 : Part 3: 2018
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 1586 : Part 3: 2018


Classification Details
Group : Metals, Alloys and Metal Products (including Steel Products)
Sub Group : Heat treatment, metallography and testing
Sub Sub Group : Methods of mechanical testing of metals
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 6508-3 : 2023
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies a method for the calibration of reference blocks to be used for the indirect and daily verification of Rockwell hardness testing machines and indenters, as specified in ISO 6508-2. This document also specifies requirements for Rockwell machines and indenters used for calibrating reference blocks and specifies methods for their calibration and verification. Attention is drawn to the fact that the use of hard metal for ball indenters is considered to be the standard type of Rockwell indenter ball.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 06-06-2024 06-11-2024 21-01-2025 05-06-2025 Mr. HAWELIKAR DUSHYANT SATYAPREM 06-06-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 17-05-2024 -------
2 P-Draft Waived 11-06-2024 ISO Adoption -------
3 WC Draft 11-06-2024 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 11-06-2024 WC approved by HOD
MTDC   -------