Name of Department/Committee : ETD 28
Document Number : ETD 28 ( 25791)
Document Title [English] : Photovoltaic (PV) Module — Safety Qualification Part 2 Requirements for Testing (Second Revision)
Document Title [Hindi] : प्रकाशवोल्टीय (पीवी) मॉड्यूल — सुरक्षा अर्हता भाग 2 परीक्षण अपेक्षाएँ (दूसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 27.160
Date of Project Approval : 04-04-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 61730 : PART 2: 2019
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 61730 : PART 2: 2019


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Renewable energy devices
Sub Sub Group : PV modules
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of New and Renewable Energy
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 61730-2:2023
Organization Type: IEC

Sl.No. Synosis Points
1 This document lists the tests a PV module is required to fulfil for safety qualification. This document applies for safety qualification only in conjunction with IEC 61730-1. The objective of this document is to provide the testing sequence intended to verify the safety of PV modules whose construction has been assessed by IEC 61730-1. The test sequence and pass criteria are designed to detect the potential breakdown of internal and external components of PV modules that would result in fire, electric shock, and/or personal injury

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 31-05-2024 31-10-2024 15-01-2025 30-05-2025 MOHAMMAD ISRAFIL 31-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 04-04-2024 -------
2 P-Draft Waived 31-05-2024 -------
3 WC Draft 03-06-2024 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 03-06-2024 WC approved by HOD
ETDC   -------