Name of Department/Committee : | ETD 28 | ||||
---|---|---|---|---|---|
Document Number : | ETD 28 ( 25790) | ||||
Document Title [English] : | Photovoltaic (PV) Module Safety Qualification Part 1 Requirements for Construction (Second Revision) | ||||
Document Title [Hindi] : | प्रकाशवोल्टीय (पीवी) मॉड्यूल — सुरक्षा अर्हता भाग 1 निर्माण हेतु अपेक्षाएँ (दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 27.160 | ||||
Date of Project Approval : | 04-04-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Renewable energy devices |
Sub Sub Group : | PV modules |
Aspects : | Product Specification |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | IEC 61730-1:2023 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This document specifies and describes the fundamental construction requirements for photovoltaic (PV) modules in order to provide safe electrical and mechanical operation. Specific topics are provided to assess the prevention of electrical shock, fire hazards, and personal injury due to mechanical and environmental stresses. This document pertains to the particular requirements of construction. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 04-04-2024 | ------- | ||
2 | P-Draft Waived | 31-05-2024 | ------- | ||
3 | WC Draft | 31-05-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 03-06-2024 | WC approved by HOD |
ETDC ETD 28, | ------- |
5 | WC Draft | 23-07-2024 | Duration : 7 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 25-07-2024 | WC rejected by HOD Remarks: Why is the need for a WC again |
------- | |
7 | WC Draft | 25-07-2024 | Duration : 7 Days Submitted for HOD approval Remarks : In the normative reference IS 17293 has been added against IEC 62930 and EN 50618 as technically modified Hence may be considered for WC |
------- | |
8 | WC Draft | 26-07-2024 | WC rejected by HOD Remarks: a |
------- | |
9 | WC Draft | 26-07-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
10 | WC Draft | 26-07-2024 | WC approved by HOD |