Document Details
Name of Department/Committee : TXD 20
Document Number : TXD 20 ( 25789)
Document Title [English] : Textiles Polyester Fibre Filled Pillows Specification
Document Title [Hindi] : वस्त्रादि — पॉलिएस्टर रेशे से भरे तकिए — विशिष्टि
Document Type : New
Language : English
Priority : 1
ICS Code : 59.060.20, 59.060.01 , 97.160
Date of Project Approval : 19-04-2024
Standards to be Superseded :


Classification Details
Group : Textile, Textile Products and Machinery
Sub Group : Cotton, wool and man made textile Products
Sub Sub Group : Made up textile items
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Railways
  • Ministry of Textiles
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 391: 2020 Textile fabrics Determination of resistance to water penetration Hydrostatic pressure test (second revision)
2 IS 667: 1981 Method for Identification of Textile Fibres (first revision)
3 IS 1390: 2022 Textiles Determination of pH of aqueous extract third revision of IS 1390
4 IS 1963: 1981 Methods for determination of threads per unit length in woven fabrics (second revision)
5 IS 1964: 2001 Textiles Methods for determination of mass per unit length and mass per unit area of fabrics (second revision)
6 IS 1969 : Part 1: 2018 Textiles Tensile properties of fabrics Part 1 Determination of maximum force and elongation at maximum force using the strip method (fourth revision)
7 IS 3416: 2024 Textiles Quantitative Chemical Analysis Mixtures of Certain Cellulose Fibres with Certain Other Fibres (Method Using Sulphuric Acid) (Third Revision)
8 IS 3442: 2023 Textiles method for determination of crimp and linear density of yarn removed from fabric
9 IS 4905: 2015 Random sampling and randomization procedures (First Revision)
10 IS 6489 : PART 1: 2011 Textiles Tear properties of fabrics Part 1 Determination of tear force using ballistic pendulum method (Elmendorf) (second revision)
11 IS 7016 : Part 5: 2019 Methods of Test for Coated and Treated Fabrics: Part 5 Rubber - or Plastics - Coated Fabrics - Determination of Coating Adhesion (Third Revision)
12 IS 7703 : Part 1: 1990 Methods of test for man-made fibres continuous filament flat yarn Part 1 Linear density (first revision)
13 IS 10014 : Part 2: 1981 Methods of Tests for Man-Made Staple Fibres Part 2 Determination of Linear Density
14 IS 10971 : PART 2: 2022 Textiles - Determination of fabric propensity to surface pilling fuzzing or matting Part 2: Modified martindale method (second revision)
15 IS/ISO 13935 : Part 1: 2014 Textiles - Seam tensile properties of fabrics and made-up textile articles Part 1 Determination of maximum force to seam rupture using the strip method (first revision)
16 IS 14452: 2023 Textiles-Care Labelling Code Using Symbols
17 IS 15370: 2023 Textiles � Domestic Washing and Drying Procedures for Textile Testing (Second Revision)
18 IS 15626: 2006 Textiles - Method for determination of colour fastness of textiles to saliva and perspiration
19 IS/ISO 105 : Part B02: 2014 Textiles Tests for colour fastness Part B02 Colour fastness to artificial light: Xenon arc fading lamp test
20 IS/ISO 105-C06: 2010 Textiles Tests for colour fastness Part C06 Colour fastness to domestic and commercial laundering (first revision)
21 IS/ISO 105-E04: 2013 Textiles - Tests for Colour Fastness Part E04 Colour Fastness to Perspiration

Sl.No. Synosis Points
1 This standard prescribes the requirements for hollow polyester filled fibre pillows which maintains the pillow’s bulk and compressive resilience while in use , along with casing fabric requirements, which encase and protect the filling fibres and maintain the shape of pillow. The standard also includes specifications for an outer protective cover that safeguards casing and filled fibres from liquids, as well as preventing the passage of saliva , sweat into the pillow.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 31-05-2024 31-08-2024 01-10-2024 01-12-2024 Mr. gourav mishra 31-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 19-04-2024 -------
2 P-Draft Waived 31-05-2024 -------
3 WC Draft 03-06-2024 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 03-06-2024 WC approved by HOD
TXDC   -------