Document Details
Name of Department/Committee : CHD 13
Document Number : CHD 13 ( 25774)
Document Title [English] : Methods of Sampling and Analysis of Water Formed Deposits Guidelines First Revision
Document Title [Hindi] : जल निर्मित निक्षेपों के नमूने लेने और विश्लेषण की पद्धतियों के सिद्धान्त – दिशानिर्देश (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 13.060.45
Date of Project Approval : 25-01-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13624: 1993
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13624: 1993


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Environment management
Sub Sub Group : Methods of Sampling and test of water and wastewater
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Chemicals and Fertilizers - Department of Chemicals and Petrochemicals (DCPC)
Sustainable development Goals :
  • CLEAN WATER AND SANITATION
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard covers the types of deposits on equipment surfaces in stream-water systems and the methods of sampling for analysis and identification of their constituents, describing briefly the nature of the deposits.
2 An attempt has been made to frame the guidelines for presentation of those methods that shall be suitable for most deposits, if not all. Methods of sampling may, however, be conveniently replaced or modified with improved techniques as they become available from time to time. However, it is important that sampling devices capable of giving a representative sample shall be used.
3 These guidelines are based on the experience gained over the years, with only those water formed deposits which are encountered while using water in the industry involving heat exchangers, steam raising equipment, (boiler and other accessories) and steam rotating equipment with a accessories, which include the end use of the steam.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 30-05-2024 30-10-2024 14-01-2025 29-05-2025 Ms. SHUBHANJALI UMRAO 30-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 25-01-2024 -------
2 P-Draft Waived 30-05-2024 -------
3 WC Draft 30-05-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The Committee decided to issue it into wide circulation for 60 days
-------
4 WC Draft 30-05-2024 WC approved by HOD
CHDC   -------