Document Details
Name of Department/Committee : ETD 28
Document Number : ETD 28 ( 25771)
Document Title [English] : Photovoltaic Devices Part 2 Requirements for Photovoltaic Reference Devices (Third Revision)
Document Title [Hindi] : प्रकाशवोल्टीय युक्तियाँ भाग 2 संदर्भ प्रकाशवोल्टीय युक्तियों की अपेक्षाएँ (तीसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : 27.160
Date of Project Approval : 04-04-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 12762 : Part 2: 2018
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 12762 : Part 2: 2018


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Renewable energy devices
Sub Sub Group : Photovoltaic devices
Aspects : Others
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of New and Renewable Energy
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 60904-2:2023
Organization Type: IEC

Sl.No. Synosis Points
1 IEC 60904-2:2023 gives requirements for the classification, selection, packaging, marking, calibration and care of photovoltaic reference devices. This document applies to photovoltaic (PV) reference devices that are used to measure the irradiance of natural or simulated sunlight for the purpose of quantifying the electrical performance of photovoltaic devices (cells, modules and arrays). It does not cover photovoltaic reference devices for use under concentrated sunlight. This edition cancels and replaces the previous edition. This edition includes the following significant technical changes with respect to the previous edition: a) added calibration procedures for calibrating PV devices at maximum power by extending the respective Clauses 12 and 13; b) revised requirements for mandatory measurement of spectral responsivity, temperature coefficients and linearity, depending on usage and allowing some measurements on equivalent devices;

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 30-05-2024 30-09-2024 30-10-2024 02-03-2025 MOHAMMAD ISRAFIL 30-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 04-04-2024 -------
2 P-Draft Waived 30-05-2024 -------
3 WC Draft 30-05-2024 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 31-05-2024 WC approved by HOD
ETDC   -------