Document Details
Name of Department/Committee : CHD 27
Document Number : CHD 27 ( 25762)
Document Title [English] : Cellular Glass Block and Pipe Thermal Insulation - Specification (First revision)
Document Title [Hindi] : जालीदार काँच खंड और पाइप ताप रोधन — विशिष्टि (पहला पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 2
ICS Code : 91.100.60
Date of Project Approval : 29-05-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11307: 1985
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 11307: 1985


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemical Products
Sub Sub Group : Thermal Insulation-Cellular Plastic
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Chemicals and Fertilizers - Department of Chemicals and Petrochemicals (DCPC)
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 24285:2022
Organization Type: ISO

Division Council Chairperson Approval Details
Request Date: 27-01-2025
Status of Chairperson Approval: Division Council Chairperson approval uploaded by member secretary  (Click to View)
Division Council Chairperson : Sourav Pal
Attachment :  View File 1
 View File 2
Sectional Committee Chairman Approval :
N/A


::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS/ISO 1716 : 2018 Reaction to Fire Tests for Products - Determination of The Gross Heat of Combustion Calorific Value
2 IS/ISO 11925 : Part 2: 2020 Reaction to fire tests - Ignitability of products subjected to direct impingement of flame - Part 2: Single-flame source test
3 IS 18973 : 2024 Thermal insulation - Determination of steady-state thermal transmission properties of thermal insulation for circular pipes

::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) ::
Sl. No. Prefix Number Part Section Year
1 ISO 1182 - - -
2 ISO 8301 - - -
3 ISO 8302 - - -
4 ISO 9229 - - -
5 ISO 12570 - - -
6 ISO 12572 - - -
7 ISO 12624 - - -
8 ISO 12628 - - -
9 ISO 13787 - - -
10 ISO 16535 - - -
11 ISO 18096 - - -
12 ISO 18097 - - -
13 ISO 29465 - - -
14 ISO 29466 - - -
15 ISO 29467 - - -
16 ISO 29468 - - -
17 ISO 29469 - - -
18 ISO 29472 - - -
19 ISO 29771 - - -
20 EN 12089 - - -

Sl.No. Synosis Points
1 The committee responsible for formulating this standard has decided to revise the standard and harmonize the standard with latest ISO standard “ISO 24285: 2022 Thermal insulation for building equipment and industrial installations — Cellular glass products” on dual number basis. This standard specifies the requirements and test methods for factory-made cellular glass products, which are used for thermal insulation of building equipment and industrial installations, with an operating temperature range of approximately −265 °C to +430 °C.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 29-05-2024 29-09-2024 29-10-2024 01-03-2025 MS. PUJA PRIYA 29-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 29-05-2024 -------
2 P-Draft Waived 29-05-2024 -------
3 WC Draft 29-05-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The committee in its meeting held on 21-03-2024 decided to revise IS 11307 by adopting ISO 24285 : 2022 and send it for wide circulation for 60 days
-------
4 WC Draft 30-05-2024 WC approved by HOD
CHDC  CHD 27, -------
5 Skipped to Finalization 07-01-2025 Stage-Changed -------
6 Finalization 07-01-2025 The committee finalized the document in its meeting held on 17-12-2024 -------
7 Final Draft 07-01-2025 Submited for HOD approval
-------
8 Final Draft draft accepted by HOD and sent to Publication 08-01-2025 Final Draft approved by HOD -------
9 Accepted by Publication 09-01-2025 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
10 Skipped to Pdf Stage 21-01-2025 Proof to Technial Department Stage-Skipped -------
11 Pdf sent by Publication to Technical Department 21-01-2025 डी सी चेयरपर्सन के अप्रूवल एवं गज़ेट डिटेल्स हेतु पी डी एफ फॉर्मैट संलग्न है । -------
12 Pdf sent by Technical Department to Publication 23-01-2025 Document checked and corrections marked in it. Kindly proceed further. -------
13 Pdf sent by Publication to Technical Department 23-01-2025 The highlighted correction has been done in document, kindly check and confirm. Also, revert along with DC approval and Give recommendation for proceeding to gazette stage. -------
14 Pdf sent by Technical Department to Publication 29-01-2025 The pdf is found in order. DC approval has also been uploaded. Kindly proceed further. -------
15 Ready for Gazette 30-01-2025 Stage-Changed -------