Document Details
Name of Department/Committee : CED 48
Document Number : CED 48 ( 25744)
Document Title [English] : Quantitative Classification Systems of Rock Mass — Guidelines: Part 3 Determination of Slope Mass Rating
Document Title [Hindi] : शैल संहति का मात्रात्मक वर्गीकरण तंत्र — दिशानिर्देश सिद्धांत: भाग 3 ढलान संहति रेटिंग का निर्धारण
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.020
Date of Project Approval : 21-03-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13365 : Part 3: 1997
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13365 : Part 3: 1997


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Soil Mechanics and Ground Improvement
Aspects : Code of Practice
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard covers the procedures for obtaining the value of slope mass rating (SMR) for preliminary assessment of the stability of rock slopes. The approach is based on modification of RMR system using adjustment factors related to discontinuity orientation with reference to slope as well as failure mode and slope excavation methods.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 28-05-2024 28-10-2024 12-01-2025 27-05-2025 Mr. DR MANOJ KUMAR RAJAK 28-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 21-03-2024 -------
2 P-Draft Waived 29-05-2024 -------
3 WC Draft 29-05-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : Slope Mass Rating
-------
4 WC Draft 30-05-2024 WC rejected by HOD
Remarks: wrong document upload
-------
5 WC Draft 30-05-2024 WC rejected by HOD
Remarks: Wrong Document upload
-------
6 WC Draft 30-05-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : Slope Mass Rating
-------
7 WC Draft 30-05-2024 WC approved by HOD
CEDC   -------