Name of Department/Committee : | CED 48 | ||||
---|---|---|---|---|---|
Document Number : | CED 48 ( 25744) | ||||
Document Title [English] : | Quantitative Classification Systems of Rock Mass — Guidelines: Part 3 Determination of Slope Mass Rating | ||||
Document Title [Hindi] : | शैल संहति का मात्रात्मक वर्गीकरण तंत्र — दिशानिर्देश सिद्धांत: भाग 3 ढलान संहति रेटिंग का निर्धारण | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.020 | ||||
Date of Project Approval : | 21-03-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Foundation, underground structures, soil and rock mechanics |
Sub Sub Group : | Soil Mechanics and Ground Improvement |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard covers the procedures for obtaining the value of slope mass rating (SMR) for preliminary assessment of the stability of rock slopes. The approach is based on modification of RMR system using adjustment factors related to discontinuity orientation with reference to slope as well as failure mode and slope excavation methods. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 21-03-2024 | ------- | ||
2 | P-Draft Waived | 29-05-2024 | ------- | ||
3 | WC Draft | 29-05-2024 | Duration : 30 Days Submitted for HOD approval Remarks : Slope Mass Rating |
------- | |
4 | WC Draft | 30-05-2024 | WC rejected by HOD Remarks: wrong document upload |
------- | |
5 | WC Draft | 30-05-2024 | WC rejected by HOD Remarks: Wrong Document upload |
------- | |
6 | WC Draft | 30-05-2024 | Duration : 30 Days Submitted for HOD approval Remarks : Slope Mass Rating |
------- | |
7 | WC Draft | 30-05-2024 | WC approved by HOD |