Document Details |
|||||
Name of Department/Committee : | ETD 13 | ||||
---|---|---|---|---|---|
Document Number : | ETD 13 ( 25722) | ||||
Document Title [English] : | Testing Equipment for a.c. Electrical Energy Meters | ||||
Document Title [Hindi] : | ए. सी. विद्युत ऊर्जा मीटरों के लिए परिक्षण उपस्कर | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 17.220.20, 91.140.50 | ||||
Date of Project Approval : | 21-05-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Switchgear, Metering and Accessories |
Sub Sub Group : | Electrical measuring equipment |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | Testing Equipment for a.c. Electrical Energy Meters |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Modified/Technically Equivalent |
Identical/Equivalent Standards : | 62057-1 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This Standard applies to Meter Test System, used for testing and calibration of electricity meters and electricity meter installations, Power meters, in particular for their type test, acceptance test and verification test in field (onsite) or laboratory as per IS 13779, IS 14697, IS 15884, IS 15959 Parts 1, 2 and 3, IS 15707 and IS 16444 Parts 1 and 2. It covers the requirements for Meter Test System for indoor laboratory application and outdoor meter testing and calibration units. It applies to meter test systems to test electricity meters on 50 Hz networks with an AC voltage up to 300V (phase to neutral). Also, the standard describes the test procedure for new meter installation as well as the one under operation. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 21-05-2024 | ------- | ||
2 | P-Draft | 21-05-2024 | Covering letter generated | ------- | |
3 | P-Draft | 21-05-2024 | Duration : 25 Days Remarks : Draft standard IS 12346 being circulated among ETD 13 members for comments for 30 days ie up to 20-06-2024 |
ETD 13, | ------- |
4 | P-Draft | 20-06-2024 | Covering letter generated | ------- | |
5 | P-Draft | 20-06-2024 | Duration : 25 Days Remarks : The committee decided to re-circulate P-draft up to 11072024 for comments |
ETD 13, | ------- |
6 | WC Draft | 23-09-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
7 | WC Draft | 24-09-2024 | WC rejected by HOD Remarks: Please provide more details in the foreword |
------- |