Document Details |
|
Name of Department/Committee : | CED 56 |
---|---|
Document Number : | CED 56 ( 25715) |
Document Title [English] : | Retaining Wall for Hill Areas - Guidelines: Part 8 Design of Reinforced Cement Concrete RCC Cantilever Retaining Walls |
Document Title [Hindi] : | पहाड़ी क्षेत्रों के लिए रिटेनिंग दीवार – दिशानिर्देश: भाग 8 प्रबलित सीमेंट कंक्रीट (आरसीसी) रिटेनिंग दीवारों का डिजाइन |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 93.020 |
Date of Project Approval : | 21-03-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Foundation, underground structures, soil and rock mechanics |
Sub Sub Group : | Foundation Engineering |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | Retaining Wall |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard is mainly focuses on the design criteria of RCC retaining walls which is used to support earth or other materials behind them which would otherwise not stay in that position. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 21-03-2024 | ------- | ||
2 | P-Draft Waived | 20-05-2024 | ------- | ||
3 | WC Draft | 20-05-2024 | Duration : 30 Days Submitted for HOD approval Remarks : RCC retaining walls |
------- | |
4 | WC Draft | 21-05-2024 | WC approved by HOD |
CEDC CED 48, WRD 06, | ------- |