Document Details
Name of Department/Committee : MED 10
Document Number : MED 10 ( 25710)
Document Title [English] : STRANDED STEEL WIRE ROPES FOR WINDING AND MAN-RIDING HAULAGES IN MINES SPECIFICATION Fourth Revision of IS 1855
Document Title [Hindi] : खानों में वेष्टन द्वारा और व्यक्ति-रोहन द्वारा ढुलाई के लिए लड़दार इस्पात के तार के रस्से — विशिष्टि ( आई एस 1855 का चौथा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 73.100.40:77.140.65
Date of Project Approval : 14-05-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 1855: 2003
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 1855: 2003


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Conveyors, hoisting and lifting equipments and rope ways
Sub Sub Group : Wire Ropes & Wire Products
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title : STRANDED STEEL WIRE ROPES FOR WINDING AND MAN-RIDING HAULAGES IN MINES
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1804: 2004 Steel wire ropes Fibre main cores Specification (fourth revision)
2 IS 1835: 1976 Specification for round steel wire for ropes (Third Revision)
3 IS 2363: 2022 GLOSSARY OF TERMS RELATING TO WIRE ROPES Second Revision
4 IS 9182 : Part 1: 1993 Lubricants for wire ropes and fibre cores - Specification: Part 1 lubricants for fibre core of wire - Ropes (First Revision)
5 IS 13917: 2003 Stranded wire ropes for mine hoisting - Technical delivery requirements (First Revision)

Sl.No. Synosis Points
1 This standard covers general requirements for stranded steel wire ropes for winding and man-riding haulages in mines. Most common rope constructions and rope types are given in following table. Common rope grades, cores and size ranges are identified by x mark.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 20-05-2024 20-10-2024 04-01-2025 19-05-2025 SHRI SANDEEP KESHAV 20-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 14-05-2024 -------
2 P-Draft Waived 20-05-2024 Committee decision -------
3 WC Draft 20-05-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : The draft standard is being wide circulated for public comments
-------
4 WC Draft 20-05-2024 WC approved by HOD
MEDC   -------
5 Skipped to Finalization 05-07-2024 Stage-Changed -------
6 Finalization 04-07-2024 The chairman MED 10 vide his mail dated 04 July 2024 approved the draft document for printing -------
7 Final Draft 05-07-2024 Submited for HOD approval
-------
8 Final Draft draft accepted by HOD and sent to Publication 08-07-2024 Final Draft approved by HOD -------