Document Details |
|||||
Name of Department/Committee : | MED 10 | ||||
---|---|---|---|---|---|
Document Number : | MED 10 ( 25706) | ||||
Document Title [English] : | STEEL WIRE ROPES FOR GENERAL ENGINEERING PURPOSE SPECIFICATION Sixth Revision of IS 2266 | ||||
Document Title [Hindi] : | सामान्य इंजीनिरिंग प्रयोजनों के लिए इस्पात तार रस्से — विशिष्टि (आई एस 2266 का छठवां पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 53.020.30; 77.140.65 | ||||
Date of Project Approval : | 14-05-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Conveyors, hoisting and lifting equipments and rope ways |
Sub Sub Group : | Wire Ropes & Wire Products |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | STEEL WIRE ROPES FOR GENERAL ENGINEERING PURPOSE |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
::Cross Referenced Indian Standard:: |
|||
Sl. No. | Is No & Year | IS Title | |
1 | IS 6594: 2018 | Technical supply conditions for steel wire ropes and strands (Third Revision) | |
2 | IS 1804: 2004 | Steel wire ropes Fibre main cores Specification (fourth revision) | |
3 | IS 1835: 1976 | Specification for round steel wire for ropes (Third Revision) | |
4 | IS 2363: 2022 | GLOSSARY OF TERMS RELATING TO WIRE ROPES Second Revision |
Sl.No. | Synosis Points | |
1 | This standard covers general requirements for steel wire ropes used in cranes, excavators and other engineering applications. Most common rope constructions and rope types are given in following table. Common rope grades, cores and size ranges are identified by ‘x’ mark however, other sizes, intermediate grades (up to including 2160 grade) and core may be supplied as agreed between manufacturer and purchaser |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 14-05-2024 | ------- | ||
2 | P-Draft Waived | 20-05-2024 | Committee decision | ------- | |
3 | WC Draft | 20-05-2024 | Duration : 30 Days Submitted for HOD approval Remarks : The document is being wide circulated for 30 days for public comments |
------- | |
4 | WC Draft | 20-05-2024 | WC approved by HOD |
MEDC | ------- |
5 | Skipped to Finalization | 05-07-2024 | Stage-Changed | ------- | |
6 | Finalization | 04-07-2024 | The chairman MED 10 vide his mail dated 04 July 2024 approved the draft document for printing | ------- | |
7 | Final Draft | 05-07-2024 | Submited for HOD approval |
------- | |
8 | Final Draft Rejected by HOD | 08-07-2024 | Final Draft rejected by HOD Remarks: Please modify table headings etc., as discussed |
------- |