Name of Department/Committee : MED 10
Document Number : MED 10 ( 25682)
Document Title [English] : STEEL WIRE ROPES FOR LIFTS MINIMUM REQUIREMENTS (Third revision of IS 2365 )
Document Title [Hindi] : लिफ्टों के लिए इस्पात के तार की रस्सियाँ — न्यूनतम अपेक्षाएँ ( IS 2365 का तीसरा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 77.140.65; 91.140.90
Date of Project Approval : 14-05-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 2365: 2018
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 2365: 2018


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Conveyors, hoisting and lifting equipments and rope ways
Sub Sub Group : Wire Ropes & Wire Products
Aspects : Product Specification
Risk : Low
Certification : Voluntary Registration
Short Commom Man's Title : STEEL WIRE ROPES FOR LIFTS
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 4344: 2022
Organization Type: ISO

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1608 : Part 1: 2022 Metallic materials - Tensile testing - Part 1 : Method of test at room temperature

::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) ::
Sl. No. Prefix Number Part Section Year
1 ISO 2232 - - -
2 ISO 3108 - - -
3 ISO 4101 - - -
4 ISO 4345 - - -
5 ISO 4346 - - -
6 ISO 17893 - - -

Sl.No. Synosis Points
1 This standard specifies the minimum requirements for the manufacture and testing of stranded carbon steel wire ropes for lifts, made from bright and galvanised wire finish in various constructions from 6 mm to 38 mm diameter

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 15-05-2024 15-10-2024 30-12-2024 15-05-2025 SHRI SANDEEP KESHAV 15-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 14-05-2024 -------
2 P-Draft Waived 15-05-2024 Committee decision -------
3 WC Draft 22-05-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : The draft document is being wide circulated for 30 days for public comments
-------
4 WC Draft 22-05-2024 WC approved by HOD
MEDC   -------
5 Skipped to Finalization 05-07-2024 Stage-Changed -------
6 Finalization 04-07-2024 The chairman MED 10 vide his mail dated 04 July 2024 approved the draft document for printing -------
7 Final Draft 05-07-2024 Submited for HOD approval

Remarks: Correction done
-------
8 Final Draft draft accepted by HOD and sent to Publication 15-07-2024 Final Draft approved by HOD -------