Document Details
Name of Department/Committee : ETD 15
Document Number : ETD 15 ( 25633)
Document Title [English] : Rotating electrical machines - Part 2-1: Standard methods for determining losses and efficiency from tests excluding machines for traction vehicles
Document Title [Hindi] : --
Document Type : Revision
Language : English
Priority : 3
ICS Code : 29.160.01
Date of Project Approval : 22-03-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 15999 : PART 2 : SEC 1: 2023
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 15999 : PART 2 : SEC 1: 2023


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Motors, Winding Wires and Accessories
Sub Sub Group : Motors, Generators & Turbines
Aspects : Methods of tests
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries
  • Ministry of Road Transport and Highways
  • Ministry of Power
Sustainable development Goals :
  • AFFORDABLE AND CLEAN ENERGY
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 60034-2-1:2024
Organization Type: IEC

Sl.No. Synosis Points
1 This standard is intended to establish methods of determining efficiencies from tests, and also to specify methods of obtaining specific losses. This document applies to DC machines and to AC synchronous and induction machines of all sizes within the scope of IEC 60034-1 rated for mains operation. These methods may be applied to other types of machines such as rotary converters, AC commutator motors and single-phase induction motors.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 14-05-2024 14-10-2024 29-12-2024 14-05-2025 Mr. JATIN TIWARI 14-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 22-03-2024 -------
2 P-Draft 14-05-2024 Covering letter generated -------
3 P-Draft 14-05-2024 Duration : 14 Days ETD 15, -------
4 Skipped to W-Draft 09-07-2024 Stage-Changed -------
5 WC Draft 09-07-2024 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 09-07-2024 WC approved by HOD
ETDC  ETD 15, -------