Document Details |
|
Name of Department/Committee : | ETD 46 |
---|---|
Document Number : | ETD 46 ( 25627) |
Document Title [English] : | Guide for Conducting Distribution Impact Studies for Distributed Resource Interconnection |
Document Title [Hindi] : | वितरित संसाधन अंत: संबधन के लिए वितरण प्रभाव अध्ययन आयोजित करने के लिए मार्गदर्शिका |
Document Type : | New |
Language : | English |
Priority : | 1 |
ICS Code : | 29.140.01 |
Date of Project Approval : | 09-05-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Electrical installations and general electricals |
Sub Sub Group : | Grid integration of renewable |
Aspects : | Code of Practice |
Risk : | Medium |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | 1547-3: 2013 |
Organization Type: | IEEE |
Sl.No. | Synosis Points | |
1 | This standard describes criteria, scope, and extent for engineering studies of the impact on area electric power systems of a distributed resource (DR) or aggregate distributed resource interconnected to an area electric power distribution system. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 09-05-2024 | ------- | ||
2 | P-Draft | 14-05-2024 | Covering letter generated | ------- | |
3 | P-Draft | 14-05-2024 | Duration : 15 Days | ETD 46, | ------- |
4 | Skipped to W-Draft | 25-06-2024 | Stage-Changed | ------- | |
5 | WC Draft | 25-06-2024 | Duration : 15 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 27-06-2024 | WC approved by HOD |
ETDC | ------- |