Document Details |
|
Name of Department/Committee : | ETD 49 |
---|---|
Document Number : | ETD 49 ( 25619) |
Document Title [English] : | Luminaires – Part 2 Particular requirements Section 18 Luminaires for swimming pools and similar applications |
Document Title [Hindi] : | प्रदीपक भाग 2 विशेष अपेक्षाएँ अनुभाग 18 स्विमिंग पूल और इसी तरह के अनुप्रयोगों के लिए प्रदीपक |
Document Type : | New |
Language : | English |
Priority : | 2 |
ICS Code : | 29.140.40 , 97.220.10 |
Date of Project Approval : | 18-04-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Electrical Appliances and Accessories |
Sub Group : | Lamps, Luminaire and Accessories |
Sub Sub Group : | Luminaires & lighting |
Aspects : | Product Specification |
Risk : | High |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | IEC 60598-2-18: 2022 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This standard specifies requirements for fixed luminaires intended for use in water, or in contact with water, in, for example, the basins of swimming pools, fountains, paddling pools, and garden pools, and for use with electric light sources. This third edition cancels and replaces the second edition published in 1993 and Amendment 1:2011. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: references to Part 1 have been updated; some subclauses have been renumbered; the standard has been redrafted such that it is applicable to both filament lamps and LED light sources; |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 18-04-2024 | ------- | ||
2 | P-Draft | 14-05-2024 | Covering letter generated | ------- | |
3 | P-Draft | 14-05-2024 | Duration : 30 Days | ETD 49, | ------- |
4 | Skipped to W-Draft | 20-11-2024 | Stage-Changed | ------- | |
5 | WC Draft | 21-11-2024 | Duration : 30 Days Submitted for HOD approval |
------- |