Document Details
Name of Department/Committee : LITD 06
Document Number : LITD 06 ( 25575)
Document Title [English] : Coaxial Communication Cables Part 1: Environmental Test Methods Section 206: Climatic Sequence (First Revision)
Document Title [Hindi] : समाक्ष संचार केबल – भाग 1: पर्यावरण परीक्षण विधियाँ - अनुभाग 206: जलवायु अनुक्रम ( पहला पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 33.120.10
Date of Project Approval : 01-04-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 61196 : PART 1 : SEC 206: 2005
Standards to be Superseded :


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Components and accessories for telecommunication
Sub Sub Group : Cables RF LF TV, radio communications
Aspects : Methods of tests
Risk : Low
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IS/IEC 61196-1-206:2017
Organization Type: IEC

Sl.No. Synosis Points
1 This part of IEC 61196 specifies the method of test to determine the stability of transmission performance of a finished RF coaxial cable when subjected to a set of temperatures, temperature changes, and humidity stresses that would accelerate exposures observed in storage and transportation.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 07-05-2024 07-10-2024 22-12-2024 07-05-2025 Mr. BIPIN JAMBHOLKAR 07-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 01-04-2024 -------
2 P-Draft Waived 07-05-2024 -------
3 WC Draft 10-05-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The committee decided to issue wide circulation for the periods of 2 months all committee members are requested to provide their inputs comments on or before due date
-------
4 WC Draft 05-06-2024 WC rejected by HOD
Remarks: review foreword
-------
5 WC Draft 12-06-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The committee in its 14th meeting decided to issue wide circulation for the periods of 2 months all committee members are requested to provide their inputs comments on or before due date
-------
6 WC Draft 19-06-2024 WC approved by HOD
LITDC  LITD 06, -------