Document Details
Name of Department/Committee : MHD 09
Document Number : MHD 09 ( 25570)
Document Title [English] : Wheelchairs Part 28 Requirements and test methods for stair-climbing devices
Document Title [Hindi] : व्हीलचेयर भाग 28 सीढ़ी चढ़ने वाले उपकरणों के लिए आवश्यकताएँ और परीक्षण विधियाँ
Document Type : New
Language : English
Priority : 2
ICS Code : ICS 11.180.10
Date of Project Approval : 06-05-2024
Standards to be Superseded :


Classification Details
Group : Medical and Hospital Equipments
Sub Group : Rehabilitation Equipments
Sub Sub Group : Rehabilitation equipment
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Social Justice and Empowerment
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 7176-28:2012
Organization Type: ISO

Sl.No. Synosis Points
1 The tests specified in this part of ISO 7176 are used to gather comparative information about factors relating to the safety and performance of a stair-climbing device while in climbing mode on stairs and in climbing mode or crawling mode on landings, as well as in driving mode. They include identification of suitable operating environments for each stair-climbing device and indications of various performance criteria in climbing mode for operations on stairs and on driving surfaces
2 This part of ISO 7176 specifies tests for the “reference configuration” of the stair-climbing device. Since some stair-climbing devices have adjustable components and/or alternative parts, testing in different configurations may be needed to determine whether a given variation conforms to this part of ISO 7176.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 06-05-2024 06-09-2024 06-10-2024 06-02-2025 Ms. GURPREET KAUR BHOMBRA 06-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 06-05-2024 -------
2 P-Draft Waived 06-05-2024 ISO Adoption -------
3 WC Draft 06-05-2024 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 06-05-2024 WC approved by HOD
MHDC   -------