Document Details
Name of Department/Committee : LITD 06
Document Number : LITD 06 ( 25559)
Document Title [English] : Coaxial Communication Cables Part 1: Electrical Test Methods Section 103: Test for Capacitance of Cable (First Revision)
Document Title [Hindi] : समाक्ष संचार केबल भाग 1: विद्युतीय परीक्षण विधियाँ अनुभाग 103: परीक्षण धारिता के लिए केबल (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 33.120.10
Date of Project Approval : 01-04-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 61196 : PART 1 : SEC 103: 2005
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 61196 : PART 1 : SEC 103: 2005


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Components and accessories for telecommunication
Sub Sub Group : Cables RF LF TV, radio communications
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 61196-1-103:2015
Organization Type: IEC

Sl.No. Synosis Points
1 IEC 61196-1-103:2015 is a standard within the series that pertains to coaxial communication cables. Specifically, it focuses on electrical test methods, presenting guidelines for evaluating the capacitance of these cables.
2 The capacitance of a cable is a crucial parameter in communication systems, influencing signal transmission characteristics. This standard provides a structured approach to measure cable capacitance accurately, ensuring consistency and reliability across different testing environments.
3 By outlining standardized test procedures, IEC 61196-1-103:2015 facilitates efficient assessment of cable capacitance during manufacturing, installation, and maintenance phases. This helps manufacturers produce cables that meet specified capacitance requirements and ensures optimal performance in various communication applications.
4 Overall, adherence to this standard promotes interoperability, quality assurance, and seamless integration of coaxial communication cables within telecommunications and broadcasting systems.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 06-05-2024 06-10-2024 21-12-2024 06-05-2025 SHRI BIPIN JAMBHOLKAR 06-05-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 01-04-2024 -------
2 P-Draft Waived 06-05-2024 -------
3 WC Draft 08-05-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The committee decided to issue wide circulation for the periods of 2 months all committee members are requested to provide their inputs comments on or before due date
-------
4 WC Draft 16-05-2024 WC approved by HOD
LITDC   -------
5 WC Draft 16-05-2024 WC approved by HOD
LITDC   -------