Document Details |
|||||
Name of Department/Committee : | CHD 01 | ||||
---|---|---|---|---|---|
Document Number : | CHD 01 ( 25414) | ||||
Document Title [English] : | Sodium Chloride Analytical Reagent Specification Second Revision of IS 4408 | ||||
Document Title [Hindi] : | सोडियम क्लोराइड, विश्लेषणात्मक अभिकर्मक — विशिष्टि (IS 4408 का दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 71.060.50 | ||||
Date of Project Approval : | 22-03-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Chemicals |
Sub Sub Group : | General Industrial Chemiclas |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard prescribes the requirements and the methods of sampling and test for sodium chloride, analytical reagent grade.In this revision, instrumental test methods for the determination of nitrates, sulphates, iron, lead, calcium, magnesium and arsenic have been added as alternate test methods. In addition to this, editorial corrections have been made wherever required. Also, Amendment No. 1 and Reference clause have been incorporated. Further, Packing and Marking clause has been updated. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 22-03-2024 | ------- | ||
2 | P-Draft Waived | 25-04-2024 | ------- | ||
3 | WC Draft | 25-04-2024 | Duration : 60 Days Submitted for HOD approval Remarks : As per decision of the Committee in its 29th Meeting held on 22 March 2024 the document is being sent for Wide Circulation Put up for approval please |
------- | |
4 | WC Draft | 01-05-2024 | WC rejected by HOD Remarks: Please discuss regarding the packing clause. |
------- | |
5 | WC Draft | 02-05-2024 | Duration : 60 Days Submitted for HOD approval Remarks : Put up again please after incorporating the necessary correction |
------- | |
6 | WC Draft | 04-05-2024 | WC approved by HOD |
CHDC CHD 01, | ------- |