Document Details
Name of Department/Committee : PCD 01
Document Number : PCD 01 ( 25411)
Document Title [English] : PETROLEUM PRODUCTS DETERMINATION OF KNOCK CHARACTERISTICS OF MOTOR AND AVIATION FUELS MOTOR METHOD Third Revision
Document Title [Hindi] : पेट्रोलियम उत्पाद - मोटर और विमानन ईंधन की नॉक विशेषताओं का निर्धारण - मोटर विधि भाग 26 का तीसरा पुनरीक्षण
Document Type : Revision
Language : English
Priority : 3
ICS Code : 75.160.20
Date of Project Approval : 05-10-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 1448 : Part 26: 2018
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 1448 : Part 26: 2018


Classification Details
Group : Coal and Petroleum products
Sub Group : Petroleum products
Sub Sub Group : Engines and Rig Performance Test Methods for Petroleum, Petroleum Products & Lubricants
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Consumer Affairs, Food and Public Distribution - Department of Consumer Affairs
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 5163: 2014
Organization Type: ISO

Sl.No. Synosis Points
1 This standard was originally published in 1960 and subsequently revised in 2013. The first revision of this standard was identical with ISO 5163: 2005 and publish the standard under dual numbering system. The second revision was identical with ISO 5163: 2014 “Petroleum products — Determination of knock characteristics of motor and aviation fuels — Motor method”. This (third) revision has been undertaken to update the corresponding Indian Standards.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 25-04-2024 25-09-2024 10-12-2024 25-04-2025 Hari Mohan Meena 25-04-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 05-10-2023 -------
2 P-Draft Waived 25-04-2024 -------
3 WC Draft 25-04-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 25-04-2024 WC approved by HOD
PCDC   -------