Document Details |
|||||
Name of Department/Committee : | PCD 25 | ||||
---|---|---|---|---|---|
Document Number : | PCD 25 ( 25403) | ||||
Document Title [English] : | PETROLEUM AND RELATED PRODUCTS REQUIREMENTS AND GUIDANCE FOR THE MAINTENANCE OF TRIARYL PHOSPHATE ESTER TURBINE CONTROL FLUIDS | ||||
Document Title [Hindi] : | पेट्रोलियम और संबंधित उत्पाद — ट्राईएराइल फॉस्फेट इस्टर टरबाइन नियंत्रण तरल पदार्थ के रखरखाव के लिए आवश्यकताएँ और मार्गदर्शन | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 75.120 | ||||
Date of Project Approval : | 25-04-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Coal and Petroleum products |
Sub Group : | Petroleum products |
Sub Sub Group : | Hydraulic fluids |
Aspects : | Code of Practice |
Risk : | High |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 11365 : 2017 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This document is applicable to the use of triaryl phosphate esters as fire-resistant fluids for turbine control and other hydraulic systems in power generation. These fluids fall under category HFDR of IS 11159 (Part 5) | |
2 | This document is intended to: — assist the power equipment operator to maintain the fluid in a condition that will ensure the safe and reliable operation of the turbine while maximizing fluid life; — recommend procedures for examining consignments of new fluid and monitoring the fluid in use; — provide information on the safe handling, storage and disposal of the fluid; — offer background information on the causes of fluid degradation. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 25-04-2024 | ------- | ||
2 | P-Draft Waived | 25-04-2024 | As this is a revision, P draft is being waived. | ------- | |
3 | WC Draft | 25-04-2024 | Duration : 60 Days Submitted for HOD approval Remarks : National Foreword attached for WC |
------- | |
4 | WC Draft | 25-04-2024 | WC approved by HOD |
PCDC | ------- |