Document Details
Name of Department/Committee : WRD 06
Document Number : WRD 06 ( 24196)
Document Title [English] : PROFORMA FOR REPORTING PROGRESS DURING CONSTRUCTION FOR RIVER VALLEY PROJECTS PART 1 IRRIGATION WORKS First Revision of IS 13218 Part 1
Document Title [Hindi] : नदी घाटी परियोजनाओं के निर्माण के दौरान हुई प्रगति की रिपोर्ट देने के लिए प्रपत्र भाग 1 सिंचाई कार्य (13218 Part 1 का पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 21-11-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13218 : Part 1: 1992
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13218 : Part 1: 1992


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Water Resources Planning Mangement and Evaluation of river valley and irrigation projects
Aspects : Others
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti
Sustainable development Goals :
  • DECENT WORK AND ECONOMIC GROWTH
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard (Part 1) was first published in 1992.This first revision has been brought out in view of the various technological changes that have taken place in this field since 1992 and to incorporate the latest practices. There is no ISO standard on the subject. This standard has been prepared based on indigenous data/practices that prevailed in the field in India. The major changes incorporated in this revision are: a) Proforma Q-1 clause 3.1.1 (b), 3.1.1 (c), 3.1.2, 3.1.4 have been modified in view of latest practices. b) Proforma Q-1 clause 3.1.6 has been added for reporting quarterly progress of medium projects. c) Col (5) of Proforma Q-2 has been modified. d) Proforma Q-4 has been modified and Col (8) & (9) have been added. e) Proforma A-1, A-2, A-3 (ii) & (iii) have been modified and Pipe Distribution Network (PDN) has been included.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 06-12-2023 31-08-2024 31-05-2025 20-11-2025 Mr. Navdeep Yadav 21-11-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 21-11-2023 -------
2 P-Draft 21-11-2023 Covering letter generated -------
3 P-Draft 21-11-2023 Duration : 15 Days WRD 6, -------
4 Skipped to W-Draft 29-07-2024 Stage-Changed -------
5 WC Draft 29-07-2024 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 29-07-2024 WC approved by HOD
WRDC  WRD 06, -------