Document Details
Name of Department/Committee : CED 36
Document Number : CED 36 ( 24967)
Document Title [English] : Fire Safety of Industrial Buildings — Cotton Textile Mills — Code of Practice (Second Revision)
Document Title [Hindi] : औद्योगिक इमारतों की अग्नि सुरक्षा — सूती वस्त्रादी मिलें — रीति संहिता (दूसरा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 2
ICS Code : 13.220.01, 59.060.01
Date of Project Approval : 01-12-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 3079: 1990
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 3079: 1990


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Safety of structures
Sub Sub Group : Fire Safety in Buildings, Industries and in Public Places
Aspects : Code of Practice
Risk : Low
Certification : None
Short Commom Man's Title : Fire Safety of Industrial Buildings Cotton Textile Mills
ITCHS Code :
Ministry :
  • Ministry of Home Affairs
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This draft standard covers the essential requirements for the fire safety of textile mills using cotton, cotton waste, regenerated cellulose, synthetic fibres, or any grouping of these as raw materials.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 26-02-2024 26-06-2024 26-07-2024 26-11-2024 Mr. RAJESH CHOUDHARY 26-02-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 01-12-2023 -------
2 P-Draft Waived 27-02-2024 -------
3 WC Draft 27-02-2024 Duration : 33 Days
Submitted for HOD approval
-------
4 WC Draft 27-02-2024 Duration : 33 Days
Submitted for HOD approval
-------
5 WC Draft 27-02-2024 WC approved by HOD
CEDC   -------
6 WC Draft 27-02-2024 WC approved by HOD
CEDC   -------