Document Details
Name of Department/Committee : CHD 27
Document Number : CHD 27 ( 24897)
Document Title [English] : Surface Spread of Flame for Thermal Insulation Materials - Methods of Test (First Revision)
Document Title [Hindi] : ताप रोधन सामग्रियों के लिए सतह पर लौ फैलने की परीक्षण पद्धति (पहला पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 2
ICS Code : ICS 91.100.60
Date of Project Approval : 15-02-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13286: 1992
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemical Products
Sub Sub Group : Thermal Insulation Materials-wool based, fibre based, cement based
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title : Surface Spread of Flame for Thermal Insulation Materials - Methods of Test
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Poverty Alleviation
  • Ministry of Commerce and Industry
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 3069: 2020 Glossary of Terms, Symbols and Units Relating to Thermal Insulation Materials ( Second Revision )

Sl.No. Synosis Points
1 This revision has been taken up in order to update the standard as per the current practices. Suitable material have been added in the test method in place of asbestos as it has been banned in India.
2 This revision is bringing out the standard in the latest style and format of the Indian Standards. The relevant clauses have been added and the references have been updated. Amendment no. 1 has also been incorporated.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 15-02-2024 15-06-2024 15-07-2024 15-11-2024 MS. PUJA PRIYA 15-02-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 15-02-2024 -------
2 P-Draft Waived 15-02-2024 -------
3 WC Draft 15-02-2024 Duration : 65 Days
Submitted for HOD approval
Remarks : The committee in its last meeting decided to send the document into wide circulation for two months
-------
4 WC Draft 22-02-2024 WC approved by HOD
CHDC   -------
5 WC-Draft 07-03-2024 WC-Draft Email Notifications Sent CHDC, CHD 27, -------
6 Skipped to Finalization 08-01-2025 Stage-Changed -------
7 Finalization 10-01-2025 The committee in its 24th meeting held on 17-12-2024 finalized the document -------
8 Final Draft 10-01-2025 Submited for HOD approval

Remarks: Kindly use the drawings attached separately in place of figures inserted in the document
-------
9 Final Draft Rejected by HOD 14-01-2025 Final Draft rejected by HOD
Remarks: Please check, it appears to be a document in track change mode.
-------
10 Final Draft 15-01-2025 Submited for HOD approval

Remarks: Kindly use the drawings attached separately in place of figures inserted in the document
-------
11 Final Draft draft accepted by HOD and sent to Publication 15-01-2025 Final Draft approved by HOD -------
12 Final Draft 21-01-2025 Final Draft rejected by Publication
Remarks: Kindly provide clear image/flowchart with lettering in capitals.
-------
13 Final Draft 23-01-2025 Submited for HOD approval

Remarks: As discussed the figures are attached again Kindly proceed for publication
-------
14 Final Draft draft accepted by HOD and sent to Publication 24-01-2025 Final Draft approved by HOD -------
15 Accepted by Publication 06-02-2025 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
16 Accepted by Publication 06-02-2025 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
17 Proof sent to Technical Department 06-02-2025 प्रथम एडिटिड कॉपी संलग्न है । कृपया डॉक्यूमेंट में दिए गए कमेन्ट का उत्तर दीजीएगा। -------
18 Proof sent to Publication 11-02-2025 Document checked and corrections marked in it. Kindly proceed further. -------
19 Skipped to Pdf Stage 12-02-2025 Proof to Technial Department Stage-Skipped -------
20 Pdf sent by Publication to Technical Department 12-02-2025 Kindly reply the comment given in the document. -------
21 Pdf sent by Technical Department to Publication 13-02-2025 Document checked and corrections marked in it. Kindly proceed further. -------