Document Details |
|||||
Name of Department/Committee : | CHD 27 | ||||
---|---|---|---|---|---|
Document Number : | CHD 27 ( 24897) | ||||
Document Title [English] : | Surface Spread of Flame for Thermal Insulation Materials - Methods of Test (First Revision) | ||||
Document Title [Hindi] : | ताप रोधन सामग्रियों के लिए सतह पर लौ फैलने की परीक्षण पद्धति (पहला पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | ICS 91.100.60 | ||||
Date of Project Approval : | 15-02-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Chemical Products |
Sub Sub Group : | Thermal Insulation Materials-wool based, fibre based, cement based |
Aspects : | Methods of tests |
Risk : | None |
Certification : | Not Certifiable |
Short Commom Man's Title : | Surface Spread of Flame for Thermal Insulation Materials - Methods of Test |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
::Cross Referenced Indian Standard:: |
|||
Sl. No. | Is No & Year | IS Title | |
1 | IS 3069: 2020 | Glossary of Terms, Symbols and Units Relating to Thermal Insulation Materials ( Second Revision ) |
Sl.No. | Synosis Points | |
1 | This revision has been taken up in order to update the standard as per the current practices. Suitable material have been added in the test method in place of asbestos as it has been banned in India. | |
2 | This revision is bringing out the standard in the latest style and format of the Indian Standards. The relevant clauses have been added and the references have been updated. Amendment no. 1 has also been incorporated. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 15-02-2024 | ------- | ||
2 | P-Draft Waived | 15-02-2024 | ------- | ||
3 | WC Draft | 15-02-2024 | Duration : 65 Days Submitted for HOD approval Remarks : The committee in its last meeting decided to send the document into wide circulation for two months |
------- | |
4 | WC Draft | 22-02-2024 | WC approved by HOD |
CHDC | ------- |
5 | WC-Draft | 07-03-2024 | WC-Draft Email Notifications Sent | CHDC, CHD 27, | ------- |
6 | Skipped to Finalization | 08-01-2025 | Stage-Changed | ------- | |
7 | Finalization | 10-01-2025 | The committee in its 24th meeting held on 17-12-2024 finalized the document | ------- | |
8 | Final Draft | 10-01-2025 | Submited for HOD approval Remarks: Kindly use the drawings attached separately in place of figures inserted in the document |
------- | |
9 | Final Draft Rejected by HOD | 14-01-2025 | Final Draft rejected by HOD Remarks: Please check, it appears to be a document in track change mode. |
------- | |
10 | Final Draft | 15-01-2025 | Submited for HOD approval Remarks: Kindly use the drawings attached separately in place of figures inserted in the document |
------- | |
11 | Final Draft draft accepted by HOD and sent to Publication | 15-01-2025 | Final Draft approved by HOD | ------- | |
12 | Final Draft | 21-01-2025 | Final Draft rejected by Publication Remarks: Kindly provide clear image/flowchart with lettering in capitals. |
------- | |
13 | Final Draft | 23-01-2025 | Submited for HOD approval Remarks: As discussed the figures are attached again Kindly proceed for publication |
------- | |
14 | Final Draft draft accepted by HOD and sent to Publication | 24-01-2025 | Final Draft approved by HOD | ------- | |
15 | Accepted by Publication | 06-02-2025 | Final Draft accepted by Publication Remarks: Accepted by Publication |
------- | |
16 | Accepted by Publication | 06-02-2025 | Final Draft accepted by Publication Remarks: Accepted by Publication |
------- | |
17 | Proof sent to Technical Department | 06-02-2025 | प्रथम एडिटिड कॉपी संलग्न है । कृपया डॉक्यूमेंट में दिए गए कमेन्ट का उत्तर दीजीएगा। | ------- | |
18 | Proof sent to Publication | 11-02-2025 | Document checked and corrections marked in it. Kindly proceed further. | ------- | |
19 | Skipped to Pdf Stage | 12-02-2025 | Proof to Technial Department Stage-Skipped | ------- | |
20 | Pdf sent by Publication to Technical Department | 12-02-2025 | Kindly reply the comment given in the document. | ------- | |
21 | Pdf sent by Technical Department to Publication | 13-02-2025 | Document checked and corrections marked in it. Kindly proceed further. | ------- |