Document Details
Name of Department/Committee : ETD 10
Document Number : ETD 10 ( 24776)
Document Title [English] : Metal Air Flow Batteries
Document Title [Hindi] : धातु वायु प्रवाह बैटरियां
Document Type : New
Language : English
Priority : 3
ICS Code : 29.220.10
Date of Project Approval : 05-02-2024
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Electrical installations and general electricals
Sub Sub Group : Batteries and cells
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The evolving landscape of energy storage and automotive technology necessitates robust standards that ensure safety, reliability, and efficiency. This standard on Metal Air Flow Batteries (MAFB) represents a significant step forward in the development and deployment of cutting-edge energy storage solutions. MAFBs, with their innovative design and performance characteristics, hold immense potential for a wide array of applications, including electrical energy storage (EES) systems and automotive power sources. This document provides a comprehensive framework for understanding and utilizing MAFBs. It encompasses key terminology and general aspects critical to this technology, facilitating clear communication and consistency within the industry. The standard elaborates on the essential terms required for defining unit parameters, thus enabling precise measurement and comparison of performance metrics.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 05-02-2024 05-07-2024 20-09-2024 04-02-2025 Mr. NEERAJ KUSHWAHA 05-02-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 05-02-2024 -------
2 P-Draft 05-02-2024 Covering letter generated -------
3 P-Draft 05-02-2024 Duration : 30 Days ETD 10, -------
4 Skipped to W-Draft 24-06-2024 Stage-Changed -------
5 WC Draft 25-06-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : As per the minutes of ETD 10 meeting held on 03 may 2024
-------
6 WC Draft 27-06-2024 WC approved by HOD
ETDC  ETD 11, ETD 52, -------