Document Details |
|
Name of Department/Committee : | ETD 10 |
---|---|
Document Number : | ETD 10 ( 24776) |
Document Title [English] : | Metal Air Flow Batteries |
Document Title [Hindi] : | धातु वायु प्रवाह बैटरियां |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 29.220.10 |
Date of Project Approval : | 05-02-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Electrical installations and general electricals |
Sub Sub Group : | Batteries and cells |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The evolving landscape of energy storage and automotive technology necessitates robust standards that ensure safety, reliability, and efficiency. This standard on Metal Air Flow Batteries (MAFB) represents a significant step forward in the development and deployment of cutting-edge energy storage solutions. MAFBs, with their innovative design and performance characteristics, hold immense potential for a wide array of applications, including electrical energy storage (EES) systems and automotive power sources. This document provides a comprehensive framework for understanding and utilizing MAFBs. It encompasses key terminology and general aspects critical to this technology, facilitating clear communication and consistency within the industry. The standard elaborates on the essential terms required for defining unit parameters, thus enabling precise measurement and comparison of performance metrics. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 05-02-2024 | ------- | ||
2 | P-Draft | 05-02-2024 | Covering letter generated | ------- | |
3 | P-Draft | 05-02-2024 | Duration : 30 Days | ETD 10, | ------- |
4 | Skipped to W-Draft | 24-06-2024 | Stage-Changed | ------- | |
5 | WC Draft | 25-06-2024 | Duration : 60 Days Submitted for HOD approval Remarks : As per the minutes of ETD 10 meeting held on 03 may 2024 |
------- | |
6 | WC Draft | 27-06-2024 | WC approved by HOD |
ETDC ETD 11, ETD 52, | ------- |