Document Details |
|
Name of Department/Committee : | ETD 44 |
---|---|
Document Number : | ETD 44 ( 24767) |
Document Title [English] : | SAFETY OF MACHINERYSAFETY-RELATED SENSORS USED FOR THE PROTECTION OF PERSONS PART 3: SENSOR TECHNOLOGIES AND ALGORITHMS |
Document Title [Hindi] : | मशीनरी की सुरक्षा- व्यक्तियों की सुरक्षा के लिए उपयोग किए जाने वाले सुरक्षा-संबंधी सेंसर भाग 3: सेंसर प्रौद्योगिकियाँ और एल्गोरिदम |
Document Type : | New |
Language : | English |
Priority : | 1 |
ICS Code : | 13.110; 21.020 |
Date of Project Approval : | 30-01-2024 |
Standards to be Superseded : |
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Electronic components and devices |
Sub Sub Group : | Electronic components |
Aspects : | Safety Standard |
Risk : | Low |
Certification : | Mandatory Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | IEC TS - 62998 - 3 - 2023 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | – analysis of sensor technologies of different wavelength ranges, measurement methods, and the sensing unit arrangement in an SRS, respectively the arrangement of SRSs in an SRSS; – representative physical properties of safety-related objects with due consideration of their material characteristics and the sensor technology/technologies used in an SRS/SRSS to achieve the detection capability and comparable results during verification and validation; – analysis of the interference of objects present in the surrounding on the safety related objects and thereby the influence on the dependability of the detection capability; – use of algorithms during design, development and maintenance to achieve appropriate detection capability and dependability of detection; – appropriate use of algorithms during the integration of SRS or SRSS by the integrator to improve execution of measurement information or provide decision information derived from measurement information. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 30-01-2024 | ------- | ||
2 | P-Draft Waived | 01-02-2024 | ------- | ||
3 | WC Draft | 01-02-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 01-02-2024 | WC approved by HOD |
ETDC | ------- |