Document Details |
|
Name of Department/Committee : | AYD 03 |
---|---|
Document Number : | AYD 03 ( 24746) |
Document Title [English] : | Spinal Bath Tub Specifications |
Document Title [Hindi] : | रीढ़स्नान के टब – विशिष्टि |
Document Type : | New |
Language : | English |
Priority : | 2 |
ICS Code : | ICS 97.140,81.060.20,97.040.60 |
Date of Project Approval : | 28-11-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Health, Sports and Fitness Services |
Sub Group : | Health, Sports and Fitness Services |
Sub Sub Group : | Health Services |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | Spinal Bath Tub – Specifications |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | Spinal Bath Tub – Specifications |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 28-11-2023 | ------- | ||
2 | P-Draft | 31-01-2024 | Covering letter generated | ------- | |
3 | P-Draft | 31-01-2024 | Duration : 14 Days Remarks : As recommended in the second Naturopathy sectional committee the P draft was circulated among the members and the comments have been forwarded to the respective Panel for necessary action The revised P draft is uploaded for commentsrnrn |
AYD 3, AYD 03, | ------- |
4 | Skipped to W-Draft | 11-03-2024 | Stage-Changed | ------- | |
5 | WC Draft | 11-03-2024 | Duration : 60 Days Submitted for HOD approval Remarks : Spinal Bath Tub Specifications as recommended in the third Naturopathy sectional committee the WC draft is uploaded for comments |
------- | |
6 | WC Draft | 04-04-2024 | WC rejected by HOD Remarks: 1. Committee composition should not be included at the WC stage. Delete Annex A. 2. Please specify tolerance for Foot rest and gradient in all Tables. 3. Weight of Spinal Bath tub shall either be as declared by manufacturer or it should be left to the agreement between manufacturer and purchaser. 4. BIS Certification clause should not be mandatory and may be included as a separate clause. |
------- | |
7 | WC Draft | 22-04-2024 | Duration : 60 Days Submitted for HOD approval Remarks : Spinal Bath Tub Specification as recommended in the third Naturopathy sectional committee the WC draft is uploaded for comments |
------- | |
8 | WC Draft | 28-05-2024 | WC rejected by HOD Remarks: As already advised, the document should be referred to Naturopathy Sectional Committee since technical changes have been done in the draft. Any technical change in the draft should be approved by sectional committee before issuance of WC draft. |
------- | |
9 | WC Draft | 18-10-2024 | Duration : 30 Days Submitted for HOD approval Remarks : Draft approved by AYD-03 TC meeting held on 24092024 for recirculation for the period of 30 days |
------- | |
10 | WC Draft | 18-10-2024 | WC approved by HOD |
AYDC AYD 03, AYD 01, AYD 02, AYD 04, AYD 05, AYD 06, AYD 07, | ------- |