Document Details
Name of Department/Committee : AYD 03
Document Number : AYD 03 ( 24744)
Document Title [English] : Hip bath Tub specification
Document Title [Hindi] : कटी स्नान टब —विशिष्टि
Document Type : New
Language : English
Priority : 2
ICS Code : ICS 97.140,81.060.20,97.040.60
Date of Project Approval : 28-11-2023
Standards to be Superseded :


Classification Details
Group : Health, Sports and Fitness Services
Sub Group : Health, Sports and Fitness Services
Sub Sub Group : Health Services
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : Hip Bath Tub – Specifications
ITCHS Code :
Ministry :
  • Ministry of AYUSH
Sustainable development Goals :
  • GOOD HEALTH AND WELL BEING
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Hip Bath Tub – Specifications

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 31-01-2024 10-05-2024 01-07-2024 01-11-2024 Mr. Venkateswar Rao Boligarla 11-03-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 28-11-2023 -------
2 P-Draft 31-01-2024 Covering letter generated -------
3 P-Draft 31-01-2024 Duration : 14 Days
Remarks : As recommended in the second Naturopathy sectional committee the P draft was circulated among the members and the comments have been forwarded to the respective Panel for necessary action The revised P draft is is uploaded for comments
AYD 3, AYD 03,  -------
4 Skipped to W-Draft 11-03-2024 Stage-Changed -------
5 WC Draft 11-03-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : Hip Bath Tub Specifications as recommended in the third Naturopathy sectional committee the WC draft is uploaded for comments
-------
6 WC Draft 04-04-2024 WC rejected by HOD
Remarks: 1. Committee composition should not be included at the WC stage. Delete Annex A. 2. Please specify tolerance for Foot rest and gradient in all Tables. 3. Weight of Spinal Bath tub shall either be as declared by manufacturer or it should be left to the agreement between manufacturer and purchaser. 4. Certification clause should not be mandatory and may be included as a separate clause.
-------
7 WC Draft 22-04-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : Hip Bath Tub Specification as recommended in the third Naturopathy sectional committee the WC draft is uploaded for comments
-------
8 WC Draft 28-05-2024 WC rejected by HOD
Remarks: As already advised, the document should be referred to Naturopathy Sectional Committee since technical changes have been done in the draft. Any technical change in the draft should be approved by sectional committee before issuance of WC draft.
-------
9 WC Draft 18-10-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : Draft approved by AYD-03 TC meeting held on 24092024 for re-circulation as WC
-------
10 WC Draft 18-10-2024 WC approved by HOD
AYDC  AYD 03, AYD 01, AYD 02, AYD 04, AYD 05, AYD 06, AYD 07, -------