Document Details |
|||||
Name of Department/Committee : | PGD 21 | ||||
---|---|---|---|---|---|
Document Number : | PGD 21 ( 24682) | ||||
Document Title [English] : | Meteorology -- Raingauges, Recording -- Specification | ||||
Document Title [Hindi] : | मौसम विज्ञान — वर्षामापी अभिलेखन — विशिष्टि | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 07.060 | ||||
Date of Project Approval : | 08-12-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Measuring and related equipments |
Sub Sub Group : | Rain gauge and other meterological instrument |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The recording raingauge consists of a collector and a rainfall recording mechanism mounted on a base. | |
2 | a) UDC number has been replaced by ICS number on first cover page; b) Reference clause has been updated; c) The grade of aluminium alloy for the rim of the collector has been updated in accordance with the latest edition of IS 617; d) In 4.1(b), word ‘animal’ has been deleted; and e) Fig. 1 has been modified based on an improved model of recording raingauge. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 08-12-2023 | ------- | ||
2 | P-Draft Waived | 08-03-2024 | ------- | ||
3 | WC Draft | 08-03-2024 | Duration : 60 Days Submitted for HOD approval Remarks : WC-Draft |
------- | |
4 | WC Draft | 08-03-2024 | WC rejected by HOD Remarks: Please discuss along with the hard copy of the document. |
------- | |
5 | WC Draft | 24-04-2024 | Duration : 60 Days Submitted for HOD approval Remarks : Sir the Draft has been uploaded after the correction |
------- | |
6 | WC Draft | 24-04-2024 | WC approved by HOD |
PGDC PGD 21, | ------- |