Document Details
Name of Department/Committee : CHD 13
Document Number : CHD 13 ( 24671)
Document Title [English] : Specification for feed water and boiler water for low and medium pressure boilers First Revision
Document Title [Hindi] : निम्न और मध्यम दबाव बॉयलरों के लिए फ़ीड पानी और बॉयलर पानी की विशिष्टता (पहलापुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 27.060.01
Date of Project Approval : 17-01-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 10392: 1982
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 10392: 1982


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemical Products
Sub Sub Group : Boiler Water Industry
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard lays down specifications for feed water and boiler water for low and medium pressure land boilers (boilers operating up to 5.9 MN/m2).
2 Land boilers operating at pressure higher than 5.9 MN/m2, marine boilers and locomotive boilers are not covered in this standard.
3 The following boilers are covered in this standard: a) Water tube boilers with super-heaters, turbine operation having process restrictions on steam purity; b) Water tube boilers without super-heaters, turbine operation and with no process restrictions on steam purity; c) Fire tube boilers; and d) Industrial coil type water tube boilers.
4 This standard was first published in 1982. In this first revision the following changes have been incorporated: a) Requirements of pH, total iron, copper, and phosphates have been modified; b) Scope has been modified; c) Requirements for parameters for water tube boilers with super-heaters, turbine operation having process restrictions on steam purity have been incorporated; d) Requirements for parameters for water tube boilers without super-heaters, turbine operation and with no process restrictions on steam purity; e) Requirements for parameters for fire tube boilers have been incorporated; f) References, ICS No. have been updated; and g) Other editorial changes have been done to bring the standard in the latest style and format of Indian Standards.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 17-01-2024 17-06-2024 01-09-2024 16-01-2025 Ms. SHUBHANJALI UMRAO 17-01-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 17-01-2024 -------
2 P-Draft Waived 17-01-2024 The Committee decided to issue it into wc for period of 2 months -------
3 WC Draft 17-01-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The Committee decided to issue it into wc for period of 2 months
-------
4 WC Draft 19-01-2024 WC approved by HOD
CHDC   -------