Document Details |
|||||
Name of Department/Committee : | PGD 18 | ||||
---|---|---|---|---|---|
Document Number : | PGD 18 ( 24668) | ||||
Document Title [English] : | Robotics Safety requirements: Part 2 Industrial robot applications and robot cells | ||||
Document Title [Hindi] : | रोबोटिक्स — सुरक्षा आवश्यकताएँ — भाग 2 औद्योगिक रोबोट अनुप्रयोग और रोबोट सेल | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 25.040.30 | ||||
Date of Project Approval : | 21-08-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Hand tools and machine components |
Sub Sub Group : | Industrial automation |
Aspects : | Safety Standard |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | ISO/FDIS 10218-2 : 2022 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This document specifies requirements for the integration of industrial robot applications and industrial robot cells. This standards deals with the significant hazards, hazardous situations or hazardous events when used as intended and under specified conditions of misuse which are reasonably foreseeable by the integrator. | |
2 | This series of Indian Standards has been created in recognition of the hazards that are presented by robots when they are integrated and installed with end-effectors into robot applications and robot cells. IS/ISO 10218-1 , addresses robots as partly completed machines, while this document addresses robots integrated into complete machines for specific robot applications. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 21-08-2023 | ------- | ||
2 | P-Draft Waived | 17-01-2024 | ------- | ||
3 | WC Draft | 17-01-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 24-01-2024 | WC approved by HOD |
PGDC | ------- |