Document Details
Name of Department/Committee : PGD 18
Document Number : PGD 18 ( 24666)
Document Title [English] : Robotics Safety requirements: Part 1 Industrial robots
Document Title [Hindi] : रोबोटिक्स — सुरक्षा आवश्यकताएँ : भाग 1 औद्योगिक रोबोट
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 25.040.30
Date of Project Approval : 21-08-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 14530 : Part 1: 2019
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 14530 : Part 1: 2019


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Hand tools and machine components
Sub Sub Group : Industrial automation
Aspects : Safety Standard
Risk : Low
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : ISO/FDIS 10218-1 : 2022
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies requirements for the inherently safe design, risk reduction measures and information for use of robots for an industrial environment. This document deals with all significant hazards, hazardous situations or hazardous events when used as intended and under specified conditions of misuse which are reasonably foreseeable by the manufacturer.
2 This series of Indian Standards has been created in recognition of the particular hazards that are presented by robotics in an industrial environment. This standard addresses robots as incomplete machines, while IS/ISO 10218-2 addresses robots integrated into complete machines (systems, applications, cells).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 17-01-2024 17-06-2024 01-09-2024 16-01-2025 SHRI KUNDAN GIRI 17-01-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 21-08-2023 -------
2 P-Draft Waived 17-01-2024 -------
3 WC Draft 17-01-2024 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 24-01-2024 WC approved by HOD
PGDC   -------