Document Details |
|||||
Name of Department/Committee : | PGD 18 | ||||
---|---|---|---|---|---|
Document Number : | PGD 18 ( 24666) | ||||
Document Title [English] : | Robotics Safety requirements: Part 1 Industrial robots | ||||
Document Title [Hindi] : | रोबोटिक्स — सुरक्षा आवश्यकताएँ : भाग 1 औद्योगिक रोबोट | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 25.040.30 | ||||
Date of Project Approval : | 21-08-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Hand tools and machine components |
Sub Sub Group : | Industrial automation |
Aspects : | Safety Standard |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | ISO/FDIS 10218-1 : 2022 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This document specifies requirements for the inherently safe design, risk reduction measures and information for use of robots for an industrial environment. This document deals with all significant hazards, hazardous situations or hazardous events when used as intended and under specified conditions of misuse which are reasonably foreseeable by the manufacturer. | |
2 | This series of Indian Standards has been created in recognition of the particular hazards that are presented by robotics in an industrial environment. This standard addresses robots as incomplete machines, while IS/ISO 10218-2 addresses robots integrated into complete machines (systems, applications, cells). |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 21-08-2023 | ------- | ||
2 | P-Draft Waived | 17-01-2024 | ------- | ||
3 | WC Draft | 17-01-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 24-01-2024 | WC approved by HOD |
PGDC | ------- |