Document Details |
|||||
Name of Department/Committee : | PGD 36 | ||||
---|---|---|---|---|---|
Document Number : | PGD 36 ( 24564) | ||||
Document Title [English] : | Connections for Hydraulic Fluid Power and General Use Ports and Stud Ends with ISO 261 Metric Threads and O-Ring Sealing Part 1 Ports with Truncated Housing for O-Ring Seal | ||||
Document Title [Hindi] : | द्र्वचालित तरल शक्ति और सामान्य प्रयोजन के लिए संयोजन — ISO 261 मेट्रिक चूडियों और O–रिंग सीलिंग वाले पोर्ट और स्टड छोर भाग 1 O-रिंग सील के लिए खण्डित हाउसिंग के साथ पोर्ट | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 23.100.40 | ||||
Date of Project Approval : | 24-08-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Hand tools and machine components |
Sub Sub Group : | Hydraulic Fittings Tee, elbow,hoses etc. |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : | |
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 6149-1 : 2022 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This document specifies dimensions for metric ports for use with the adjustable and non-adjustable stud ends as described in IS 13170 (Part 2) and IS 13170 (Part 3). | |
2 | This standard was originally published in 1991 and subsequently revised in 1999 and 2021. The third revision of this standard has been undertaken to align it with the latest version of ISO 6149-1. In this revision, corrections have been made to references in Table 2 |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 24-08-2023 | ------- | ||
2 | P-Draft Waived | 09-01-2024 | ------- | ||
3 | WC Draft | 09-01-2024 | Duration : 60 Days Submitted for HOD approval Remarks : Correction have been made as marked in the hard copy Submitted for your kind approval please |
------- | |
4 | WC Draft | 09-01-2024 | WC approved by HOD |
PGDC | ------- |