Document Details |
|||||
Name of Department/Committee : | PGD 36 | ||||
---|---|---|---|---|---|
Document Number : | PGD 36 ( 24560) | ||||
Document Title [English] : | Metallic Tube Connections for Fluid Power and General Use Test Methods for Hydraulic Fluid Power Connections | ||||
Document Title [Hindi] : | तरल शक्ति और सामान्य उपयोग के लिए धातु की नली के संयोजक — चूड़ी वाले द्रवचालित तरल शक्ति संयोजक यंत्र के लिए परिक्षण पद्धति | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 23.040.60; 23.100.40 | ||||
Date of Project Approval : | 24-08-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Hand tools and machine components |
Sub Sub Group : | Hydraulic Fittings Tee, elbow,hoses etc. |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : | |
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 19879 : 2021 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | The major changes in this version as follows: a) The language used to describe the connector end, and of the proper method for selecting tubes for test assemblies has been clarified; and b) Repeated assembly test, leakage test, vibration test and overtightening tests have been added. c) Proof test, burst test, cyclic endurance test, vacuum test and cyclic endurance tests have been revised. | |
2 | This document specifies uniform methods for the testing and performance evaluation of metallic tube connections, stud ends for ports and flange connections for use in hydraulic fluid power applications. This document does not apply to the testing of hydraulic quick-action couplings, which is covered by ISO 18869. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 24-08-2023 | ------- | ||
2 | P-Draft Waived | 09-01-2024 | ------- | ||
3 | WC Draft | 09-01-2024 | Duration : 60 Days Submitted for HOD approval Remarks : Correction have been made as marked in the hard copy Submitted for your kind approval please |
------- | |
4 | WC Draft | 10-01-2024 | WC rejected by HOD Remarks: IS 10416 third revision |
------- | |
5 | WC Draft | 16-01-2024 | Duration : 60 Days Submitted for HOD approval Remarks : The reference to IS 10416 has been corrected I submitted it for your kind approval please |
------- | |
6 | WC Draft | 24-01-2024 | WC rejected by HOD Remarks: Please write WC with document number. |
------- |