Document Details
Name of Department/Committee : PGD 36
Document Number : PGD 36 ( 24560)
Document Title [English] : Metallic Tube Connections for Fluid Power and General Use Test Methods for Hydraulic Fluid Power Connections
Document Title [Hindi] : तरल शक्ति और सामान्य उपयोग के लिए धातु की नली के संयोजक — चूड़ी वाले द्रवचालित तरल शक्ति संयोजक यंत्र के लिए परिक्षण पद्धति
Document Type : Revision
Language : English
Priority : 3
ICS Code : 23.040.60; 23.100.40
Date of Project Approval : 24-08-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 15277: 2002
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 15277: 2002


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Hand tools and machine components
Sub Sub Group : Hydraulic Fittings Tee, elbow,hoses etc.
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 19879 : 2021
Organization Type: ISO

Sl.No. Synosis Points
1 The major changes in this version as follows: a) The language used to describe the connector end, and of the proper method for selecting tubes for test assemblies has been clarified; and b) Repeated assembly test, leakage test, vibration test and overtightening tests have been added. c) Proof test, burst test, cyclic endurance test, vacuum test and cyclic endurance tests have been revised.
2 This document specifies uniform methods for the testing and performance evaluation of metallic tube connections, stud ends for ports and flange connections for use in hydraulic fluid power applications. This document does not apply to the testing of hydraulic quick-action couplings, which is covered by ISO 18869.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 04-01-2024 04-06-2024 19-08-2024 03-01-2025 Mr. MONARCH JOSHI 04-01-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 24-08-2023 -------
2 P-Draft Waived 09-01-2024 -------
3 WC Draft 09-01-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : Correction have been made as marked in the hard copy Submitted for your kind approval please
-------
4 WC Draft 10-01-2024 WC rejected by HOD
Remarks: IS 10416 third revision
-------
5 WC Draft 16-01-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The reference to IS 10416 has been corrected I submitted it for your kind approval please
-------
6 WC Draft 24-01-2024 WC rejected by HOD
Remarks: Please write WC with document number.
-------