Document Details
Name of Department/Committee : ETD 20
Document Number : ETD 20 ( 24505)
Document Title [English] : Lightning protection system components LPSC Part 8: Requirements for components for isolated LPS
Document Title [Hindi] : विद्युत संरक्षण प्रणाली कम्पोनेंट्स (एलपीएससी) - भाग 8: पृथक एलपीएस के लिए कम्पोनेंट्स की आवश्यकताएँ
Document Type : New
Language : English
Priority : 3
ICS Code : 29.020; 91.120.40
Date of Project Approval : 27-12-2023
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Electrical installations and general electricals
Sub Sub Group : National Electrical Code
Aspects : Product Specification
Risk : Medium
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 62561-8-2018
Organization Type: IEC

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS/IEC 60060 : PART 2: 2010 High - Voltage test techniques: Part 2 measuring systems
2 IS 15638 : Part 1: 2023 Instruments And Software Used For Measurements In High-Voltage And High-Current Tests Part 1: Requirements For Instruments For Impulse Tests First Revision

Sl.No. Synosis Points
1 This standard specifies the requirements and tests for insulating stand-offs, used in conjunction with an air-termination system and down-conductors with the aim of maintaining the proper separation distance, and the requirements and tests for insulating down conductors, including their specific fasteners, able to reduce the separation distance.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 27-12-2023 27-05-2024 11-08-2024 26-12-2024 RITWIK ANAND 27-12-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 27-12-2023 -------
2 P-Draft Waived 27-12-2023 -------
3 WC Draft 27-12-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 28-12-2023 WC approved by HOD
ETDC  ETD 20, -------
5 Skipped to Finalization 21-07-2024 Stage-Changed -------
6 Finalization 18-06-2024 Electrical Installations Sectional Committee ETD 20 during its 41st meeting held on 18th June 2024 approved the document for printing -------
7 Final Draft 21-07-2024 Submited for HOD approval

Remarks: Electrical Installations Sectional Committee ETD 20 during its 41st meeting held on 18th June 2024 approved the document for printing
-------
8 Final Draft draft accepted by HOD and sent to Publication 22-07-2024 Final Draft approved by HOD -------