Document Details
Name of Department/Committee : ETD 20
Document Number : ETD 20 ( 24498)
Document Title [English] : Lightning protection system components LPSC - Part 1: Requirements for connection components
Document Title [Hindi] : विद्युत संरक्षण प्रणाली कम्पोनेंट्स (एलपीएससी) भाग 1 कनेक्शन कम्पोनेंट्स के लिए आवश्यकताएँ
Document Type : New
Language : English
Priority : 3
ICS Code : 29.020; 91.120.40
Date of Project Approval : 27-12-2023
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Electrical installations and general electricals
Sub Sub Group : National Electrical Code
Aspects : Product Specification
Risk : Medium
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 62561-1-2023
Organization Type: IEC

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
No Cross References

Sl. No. Document No Document Title
No Cross References

::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) ::
Sl. No. Prefix Number Part Section Year
No Cross References.

Sl.No. Synosis Points
1 This standard specifies the requirements and tests for metallic connection components that form part of a lightning protection system (LPS). Typically, these can be connectors, clamps, bonding and bridging components, expansion pieces and test joints.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 27-12-2023 27-05-2024 11-08-2024 26-12-2024 RITWIK ANAND 27-12-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 27-12-2023 -------
2 P-Draft Waived 27-12-2023 -------
3 WC Draft 27-12-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 27-12-2023 WC approved by HOD
ETDC  ETD 20, -------
5 Skipped to Finalization 21-07-2024 Stage-Changed -------
6 Finalization 18-06-2024 Electrical Installations Sectional Committee ETD 20 during its 41st meeting held on 18th June 2024 approved the document for printing -------
7 Final Draft 21-07-2024 Submited for HOD approval

Remarks: Electrical Installations Sectional Committee ETD 20 during its 41st meeting held on 18th June 2024 approved the document for printing
-------
8 Final Draft draft accepted by HOD and sent to Publication 22-07-2024 Final Draft approved by HOD -------